Notifications
You must be signed in to change notification settings - Fork 2
/
Copy pathfind_optimal.pl
95 lines (82 loc) · 2.48 KB
/
find_optimal.pl
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
% Project Declarative Programming %
% Jens Nevens %
% %
% find_optimal(-S) %
% is_optimal(?S) %
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
:- module(find_optimal, [find_optimal/1,
is_optimal/1]).
%:- use_module(small_instance).
%:- use_module(large_short_instance).
%:- use_module(large_long_instance).
:- use_module(utils).
:- use_module(valid).
:- use_module(cost).
:- dynamic best/2.
% find_optimal(-S)
% -S: Schedule with lowest cost.
%
% Binds S to a schedule with the lowest cost.
% For this, the optimal/1 predicate is called.
% This will assert all best schedules with the
% best/2 functor. Since find_optimal/1 only needs
% to return one possible schedule, a cut is placed
% at the end.
find_optimal(Schedule) :-
optimal(_),
best(Schedule, Cost),
format("Best Cost is ~f", Cost),
retractall(best(_,_)),
!.
% is_optimal(-S)
% -S: Schedule with lowest cost
%
% Binds S to all possible schedules with lowest
% cost. For this, the optimal/1 predicate is called.
% This will assert all best schedules with the best/2
% functor. Since is_optimal/1 needs to return all
% optimal schedules, it is allowed to backtrack
% over the best-predicate.
is_optimal(Schedule) :-
optimal(_),
best(Schedule, Cost),
format("Best Cost is ~f", Cost),
retract(best(Schedule,_)).
% optimal(-S)
% -S: Schedule with lowest cost
%
% Generates all possible schedules, calculates their
% cost and updates the best using update_best/2.
% The fail at the end ensures backtracked over is_valid/1.
% When this is no longer possible, optimal(-S) succeeds
% through the second predicate.
optimal(_) :-
assert(best(nil,1000000)),
is_valid(Schedule),
cost(Schedule,Cost),
update_best(Schedule,Cost),
fail.
optimal(_) :- !.
% update_best(+Schedule, +Cost)
% +Schedule: schedule/1 functor that contains a list of
% event/4 functors.
% +Cost: integer
%
% Succeeds when the best schedule, i.e. the schedule with
% the lowest cost, is replaced with the given schedule with
% given cost because its cost is even lower. When the cost is
% the same, the schedule is also asserted using the best/2
% function. When this is not the case, nothing is done.
update_best(Schedule, Cost) :-
best(_,BestCost),
Cost == BestCost,
!,
assert(best(Schedule,Cost)).
update_best(Schedule,Cost) :-
best(_,BestCost),
Cost < BestCost,
!,
retractall(best(_,_)),
assert(best(Schedule,Cost)).
update_best(_,_).