Writing down the processes to do our releases. Status: please review & approve so we can go ahead. --------- Signed-off-by: Oliver Tale-Yazdi <[email protected]> Co-authored-by: joe petrowski <[email protected]> Co-authored-by: Liam Aharon <[email protected]> Co-authored-by: Bastian Köcher <[email protected]> Co-authored-by: Kian Paimani <[email protected]> Co-authored-by: Jegor Sidorenko <[email protected]>
- Loading branch information
1 parent
3717ec3
commit d72fb58
Showing
3 changed files
with
204 additions
and
0 deletions.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,22 @@ | ||
# Audit | ||
|
||
Audits are conducted to ensure the absence of severe or exploitable bugs. Pull Requests are generally merged into the | ||
`master` branch without audit. The `audited` tag is used to track the latest audited commit of the `master` branch. This | ||
means that audits need to happen in order of being merged. | ||
This is an optimistic approach that lets us develop with greater speed, while requiring (possibly) large refactors in | ||
the failure case. | ||
|
||
Audits can be deferred if the logic is gated by an `experimental` feature or marked as "Not Production Ready" within the | ||
first line of doc. Such changes should be queued manually before these warnings are removed. | ||
|
||
## General Guidelines for what to Audit | ||
|
||
There is no single one-fits-all rule. Generally we should audit important logic that could immediately be used on | ||
production networks. If in doubt, ask in chat or in the Merge Request. | ||
|
||
## Requesting an Audit | ||
|
||
1. Add the PR to the project `Security Audit (PRs) - SRLabs` | ||
2. Set status to Backlog | ||
3. Assign priority, considering the universe of PRs currently in the backlog | ||
4. Add the component |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,162 @@ | ||
# Release | ||
|
||
The outputs of a release are the `polkadot` and `polkadot-parachain` node binaries, the runtimes for Westend & Rococo | ||
and their system parachains, and new crate versions published to `crates.io`. | ||
|
||
# Setup | ||
|
||
We have two branches: `master` and `stable`. `master` is the main development branch where normal Pull Requests are | ||
opened. Developers need to mostly only care about this branch. | ||
The `stable` branch contains a version of the code that is ready to be released. Its contents are always audited. | ||
Merging to it is restricted to [Backports](#backports). | ||
|
||
# Versioning | ||
|
||
We are releasing multiple different things from this repository in one release, but we don't want to use the same | ||
version for everything. Thus, in the following we explain the versioning story for the crates, node and Westend & | ||
Rococo. To easily refer to a release, it shall be named by its date in the form `stableYYMMDD`. | ||
|
||
## Crate | ||
|
||
We try to follow [SemVer 2.0.0](https://semver.org/) as best as possible for versioning our crates. SemVer requires a | ||
piece of software to first declare a public API. The public API of the Polkadot SDK is hereby declared as the sum of all | ||
crates' public APIs. | ||
|
||
|
||
Inductively, the public API of our library crates is declared as all public items that are neither: | ||
- Inside a `__private` module | ||
- Documented as "unstable" or "experimental" in the first line of docs | ||
- Bear `unstable` or `experimental` in their absolute path | ||
|
||
## Node | ||
|
||
The versioning of the Polkadot node is done most of the time by only incrementing the `minor` version. The `major` | ||
version is only bumped for special releases and the `patch` can be used for an out of band release that fixes some | ||
critical bug. The node version is not following SemVer. This means that the version doesn't express if there are any | ||
breaking changes in the CLI interface or similar. The node version is declared in the | ||
[`NODE_VERSION`](https://paritytech.github.io/polkadot-sdk/master/polkadot_node_primitives/constant.NODE_VERSION.html) | ||
variable. | ||
|
||
## Westend & Rococo | ||
|
||
For the these networks, in addition to incrementing the `Cargo.toml` version we also increment the `spec_version` and | ||
sometimes the `transaction_version`. The spec version is also following the node version. Its schema is: `M_mmm_ppp` and | ||
for example `1_002_000` is the node release `1.2.0`. This versioning has no further meaning, and is only done to map | ||
from an on chain `spec_version` easily to the release in this repository. | ||
The Westend testnet will be updated to a new runtime every two weeks with the latest `nightly` release. | ||
|
||
# Backports | ||
|
||
**From `master` to `stable`** | ||
|
||
Backports in this direction can be anything that is audited and either a `minor` or a `patch` bump. [Security | ||
fixes](#bug-and-security-fix) should be prioritized over additions or improvements. Crates that are declared as internal | ||
API can also have `major` version bumps through backports. | ||
|
||
**From `stable` to `master`** | ||
|
||
Should not be needed since all changes first get merged into `master`. The `stable` branch can get out of sync and will | ||
be synced with the [Clobbering](#clobbering) process. | ||
|
||
# Processes | ||
|
||
The following processes are necessary to actualize our releases. Each process has a *Cadence* on which it must execute | ||
and a *Responsible* that is responsible for autonomously doing so and reporting back any error in the *RelEng: Polkadot | ||
Release Coordination* Matrix channel. All processes should be automated as much as possible. | ||
|
||
## Crate Bumping | ||
|
||
Cadence: (possibly) each Pull Request. Responsible: Developer that opened the Pull Request. | ||
|
||
Following SemVer isn't easy, but there exists [a guide](https://doc.rust-lang.org/cargo/reference/semver.html) in the | ||
Rust documentation that explains the small details on when to bump what. This process is supported with a CI check that | ||
utilizes [`cargo-semver-checks`](https://github.com/obi1kenobi/cargo-semver-checks). | ||
|
||
### Steps | ||
|
||
1. Developer opens a Pull Request with changed crates against `master`. | ||
1. They bump all changed crates according to SemVer. Note that this includes any crates that expose the changed | ||
behaviour in their *public API* and also transitive dependencies for whom the same rule applies. | ||
|
||
## Stable Release | ||
|
||
Cadence: every two weeks. Responsible: Release Team. | ||
|
||
This process aims to release the `stable` branch as a *Stable* release every two weeks. | ||
|
||
### Steps | ||
|
||
1. Check and execute process [Clobbering](#clobbering), if needed. | ||
2. Check if there were any changes since the last release and abort, if not. | ||
3. Check out the latest commit of `stable`. | ||
4. Update the `CHANGELOG.md` version, date and compile the content using the PrDoc files. | ||
5. Open a Pull Request against `stable` for visibility of the release happening. | ||
6. Internal QA from the release team can happen here. | ||
7. Do a dry-run release to ensure that it *should* work. | ||
8. Comment in the Pull Request that a *Stable* release will happen from the merged commit hash. | ||
9. Release all changed crates to crates.io. | ||
10. Create the release `stableYYYYMMDD` on GitHub. Note that the Fellowship has a streamlined process that combines the | ||
two last steps. A similar approach should be taken here. | ||
|
||
## Nightly Release | ||
|
||
Cadence: every day at 00:00 UTC+1. Responsible: Release Team | ||
|
||
This process aims to release the `master` branch as a *Nightly* release. The process can start at 00:00 UTC+1 and should | ||
automatically do the following steps. | ||
|
||
1. Check out the latest commit of branch `master`. | ||
2. Compare this commit to the latest `nightly*` tag and abort if there are no changes detected. | ||
3. Set the version of all crates that changed to `major.0.0-nightlyYYMMDD` where `major` is the last released `major` | ||
version of that crate plus one. | ||
4. Patch the dependencies of the changed crates to point to the newest version of the dependency. | ||
5. Tag this commit as `nightlyYYMMDD`. | ||
6. Do a dry-run release to ensure that it *should* work. | ||
7. Push this tag (the commit will not belong to any branch). | ||
8. Release all crates that had changed to crates.io. | ||
|
||
## Clobbering | ||
|
||
Cadence: every 6th release (~3 months). Responsible: Release Team | ||
|
||
This process aims to bring branch `stable` in sync with the latest audited commit of `master`. It is not done via a Pull | ||
Request but rather by just copying files. It should be automated. | ||
The following script is provided to do the clobbering. Note that it keeps the complete history of all past clobbering | ||
processes. | ||
|
||
```bash | ||
# Ensure we have the latest remote data | ||
git fetch | ||
# Switch to the stable branch | ||
git checkout stable | ||
|
||
# Delete all tracked files in the working directory | ||
git ls-files -z | xargs -0 rm -f | ||
# Find and delete any empty directories | ||
find . -type d -empty -delete | ||
|
||
# Get the last audited commit | ||
AUDITED=$(git rev-parse --short=10 origin/audited) | ||
# Grab the files from the commit | ||
git checkout $AUDITED -- . | ||
|
||
# Stage, commit, and push the working directory which now matches 'audited' 1:1 | ||
git add . | ||
git commit -m "Clobbering with audited ($AUDITED)" | ||
git push | ||
``` | ||
|
||
## Bug and Security Fix | ||
|
||
Cadence: n.a. Responsible: Developer | ||
|
||
Describes how developers should merge bug and security fixes. | ||
|
||
### Steps | ||
|
||
1. Developer opens a Pull Request with a bug or security fix. | ||
2. The Pull Request is marked as priority fix. | ||
3. Audit happens with priority. | ||
4. It is merged into `master`. | ||
5. It is automatically back-ported to `stable`. | ||
6. The fix will be released in the next *Stable* release. In urgent cases, a release can happen earlier. |