Addition of unit commitment as an input parameter. Extra field
connect.power.UC
-
Addition of inter-temporal power ramp constraints. Extra field
connect.power.ramp_time
for setting generation ramp-times. -
Improved nargout checking in
wey_approx.m
for passing only needed data based on Jacobian and Hessian evaluation calls frommpng.m
-
Redefinition of the default region of approximation of Weymouth's equation (Pi*), according to a percentage of the pipeline's maximum flow.
-
Addition of a new optional field
mgc.wey_percent
for allowing the user to specify a different approximation region for Weymouth's equation (Pi*). -
Temporal workaround for allowing compressor ratios to be lower or equal to 1.0 in order to model turboexpanders (i.e compressors with negative power consumption, that is, positive generation). Thanks to a question from Roman Korab.
-
Minor fix to ensure that actual nodal gas demand in
mgc.node.dem
matches total gas demand inmgc.node.info(:,GD)
. -
Fixes in per unit conversion of some quantities.
-
Release of
Example3.m
. It shows MPNG's performance taking turboexpanders into account. -
Release of
Example4.m
andconnection_pg_case118.m
. This example simulates the 118-bus & 48-node power&gas system over a 24-hour horizon and tests the new MPNG's features regarding the assessment of given unit commitment schedules and start-up/shut-down generation ramps. -
A new option has been enabled in all
Examples
for allowing passing the initial point contained in power&gas cases to the solver.