You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Why this feature is necessary:
Because it currently requires the analyst to track down where the cost data is coming, but is a critical component and is almost always required.
A possible solution is:
Require the dollar year in any configuration file with dollar inputs, and output it as a field in our CSVs or an attribute in our HDF5s.
Charge code:
reV Maintenance GDOP.12495.31.01.01
Urgency / Timeframe:
End of Q3/Beginning of Q4
The text was updated successfully, but these errors were encountered:
Why this feature is necessary:
Because it currently requires the analyst to track down where the cost data is coming, but is a critical component and is almost always required.
A possible solution is:
Require the dollar year in any configuration file with dollar inputs, and output it as a field in our CSVs or an attribute in our HDF5s.
Charge code:
reV Maintenance GDOP.12495.31.01.01
Urgency / Timeframe:
End of Q3/Beginning of Q4
The text was updated successfully, but these errors were encountered: