You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Some load zones have over 100 Wind and Solar plants making the model very hard to solve.
Temporary solution
I've written a post processing step to aggregate plants using the results from a previous run to calculate aggregate capacity factors.
Next steps
We need a more robust way to aggregate the plants and their capacity factors. We likely want a few plants in every load zone that accurately represent all the different candidate plants. The challenge is building this reduced set of representative plants. Parameters we need to consider are: capacity factors, connection costs and total generation capacity (all other parameters don't vary between Wind & Solar plants).
The text was updated successfully, but these errors were encountered:
Problem
Temporary solution
Next steps
The text was updated successfully, but these errors were encountered: