Feature Planning
W. Bomar edited this page Mar 5, 2021
·
8 revisions
Proposed in 2021-02. Documented on 2021-03-04.
New features, or enhancements, should be planned at least one sprint in advance of the sprint on which they are worked.
- Receive stakeholder wants. Sources:
- Dev BA
- Design
- Developers
- Understand stakeholder wants. Participants:
- Dev BA
- (for interfaces) Design
- (for interfaces) UI BA
- Understand development solutions. Participants:
- Developers
- Dev BA¹
- (for interfaces) UI BA¹
- (for interfaces) Design¹
- Finalize requirements.
- Dev BA (or Developers)
- (for interfaces) UI BA (or Designers)
¹ These participants can be optional if feature is:
- simple enough,
- documented well enough, or
- already familiar to other participant(s).
² Depending on availability and familiarity, others may finalize requirements on behalf of the relevant BA.
TACC ACI WMA Core-Portal Project Documentation