You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
I can layer concrete up to 7/8ths of a block just fine, but when I try to pour a full block of concrete, whether by layering multiple buckets over a long period of time or by pouring a bucket of concrete into a 1x1 mold, it takes much longer to dry out.
It works just fine when I add rebar, though. Is this intentional?
The text was updated successfully, but these errors were encountered:
I can layer concrete up to 7/8ths of a block just fine, but when I try to pour a full block of concrete, whether by layering multiple buckets over a long period of time or by pouring a bucket of concrete into a 1x1 mold, it takes much longer to dry out.
It works just fine when I add rebar, though. Is this intentional?
The text was updated successfully, but these errors were encountered: