You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Hi,
On the same project than my previous issue (migration 1.7 EE hybrid storage to Akeneo 2.0), I'm trying to migrate 400k products.
Today I can process 4k products by hour approximately, : it means that I will need 100 hours for the whole catalog ! Is Transporteo a suitable tool for large projects ? Can we increase/optimize the speed of the process ?
Moreover everytime we shutdown process and relaunch it, it clears the database and starts again from zero :/ Is there a way to keep in memory the products which have already been migrated ?
The text was updated successfully, but these errors were encountered:
Hi,
On the same project than my previous issue (migration 1.7 EE hybrid storage to Akeneo 2.0), I'm trying to migrate 400k products.
Today I can process 4k products by hour approximately, : it means that I will need 100 hours for the whole catalog ! Is Transporteo a suitable tool for large projects ? Can we increase/optimize the speed of the process ?
Moreover everytime we shutdown process and relaunch it, it clears the database and starts again from zero :/ Is there a way to keep in memory the products which have already been migrated ?
The text was updated successfully, but these errors were encountered: