Our team was tasked with upgrading and maintaining an already existing prototype device. This device, made by CORIS Innovation, is an anti-theft connected device.
Our team was asked to bring our expertise to the device to improve the overall quality, security, and usability of the device.
We have to improve the battery's lifespan and optimise its performance, manage the device using the NFC technology, allow multi-threading, and improve the security of the device.
This document will serve to prepare all the tools and define the testing strategy of the product to make sure that our refurbished device complies with the client's requirements.
This document is primarily intended for:
- Quality Assurance: to comprehend what should be tested, the expected result, how to get the expected result, and why. To make sure that the device complies with the client's requirements. To define the stakes of testing and guide the team through tests. To then improve the quality of the final product.
- Future testers: to understand our team's testing strategy, what our QA team has tested, how, and the final result. To apply our testing strategy if it complies with what they are testing. To have an insight into our testing strategies to keep on upgrading the product.
- C++ 11.
- nRF52 Assembly.
- Arduino IDE & Compiler v2.3.3.
- list of dependencies:
- NRF52_MBED_TimerInterrupt V1.4.1.
- adafruit-nrfutil 0.5.3 (for Linux).
- ArduinoBLE V1.3.6.
- Sim800L HTTP connector V1.14.0.
- Seeed Arduino LSM6DS3 V2.0.3.
- OneWire V2.3.7.
- FreeRTOS V11.0.1-5.
The testing team will be divided into three. Our team's, Team seven's and Team five's Quality Assurance. A collaboration has been established among the three teams for testing purposes and the project's well-being.
Our team's QA (Team 8):
- MARLIER Thibaud (Windows)
Team Seven's QA:
- KAKAL Mathis (MacOS)
Team Five's QA:
- PREVOST Antoine (Windows)
However, our team has the possibility of having a Linux environment as BERNARD Max has such an Operating System. It will be useful to widen the range of the testing environment.
Each team will run their Testing Strategies and will use their own Test Plan document while testing. Whenever a product is tested by a team their strategy will be applied for testing. I'd recommend you check Team 5 and Team 7 Test Plans.
The main things that will be tested and quality checked during this project will be:
- The documents
- The software and how it behaves with the hardware
It is imperative to thoroughly assess the quality of the documentation to guarantee that it effectively conveys the intended message. Ensuring clear and effective communication is crucial in any project of this nature.
Our review process will encompass scrutinising the documents for grammatical and typographical errors, as well as evaluating the content for accuracy and completeness. This meticulous examination helps mitigate the risk of overlooking essential points and ensures that the document facilitates effective communication and understanding. By proactively addressing errors and potential threats, we aim to optimise efficiency and safeguard the integrity of the product.
Regarding both the software and hardware components, our testing focus will be on the features outlined in the functional and technical specifications.
These features will undergo rigorous testing to ensure alignment with the client's requirements and to verify their functionality as intended. Our objective is to replicate the final product's environment as closely as feasible during testing.
Our team has opted for the waterfall testing strategy, which follows a linear and sequential approach to software testing. This method is structured into distinct phases, with each phase being completed before progressing to the next. The waterfall model is best suited for projects with well-defined requirements and a fixed scope. Here's an overview of the phases:
Testing begins by thoroughly understanding the requirements outlined during the software development's requirements analysis phase.
Testers carefully review these requirements to develop comprehensive test cases and test plans.
During this phase, testers create test cases based on the system design documents.
Additionally, they may formulate test data and plans for setting up the testing environment.
Once the development team finishes coding, testing activities focus on unit testing. This involves testing individual components or modules in isolation. This part will principally be handled by the development team.
Testers verify that the individual modules integrate seamlessly and function correctly together. This ensures that interactions between different modules do not lead to unexpected behaviour.
After integration testing, the entire system undergoes comprehensive testing. Testers assess whether the software meets the specified requirements and operates correctly across various scenarios.
In the final phase, users or stakeholders test the software in a real-world environment to validate that it fulfills their needs and expectations. This testing typically occurs before the software is released into production.
Once the software is released, users provide feedback on its performance and usability. This feedback is crucial for identifying areas that require improvement and enhancing the software's overall quality.
This model then loops if a new bug is found or if a new feature is added to the software. The testing team will then have to go back to the requirements analysis phase and start the process again.
It might be a long process but it is the most efficient way to ensure the quality of the product.
For this project, our team depends on the hardware provided by the client, which has undergone testing before the commencement of our project and has been confirmed to be in a functional state.
Consequently, we operate under the assumption that the hardware does not introduce any issues, as we have confidence in its reliability based on the client's assurances.
If problems arise, any bugs or issues can only be attributed to our team's actions, as the team acknowledges our responsibility for the software's performance.
Additionally, we recognise that any potential hardware malfunctions could result from mishandling on our part.
Therefore, our team is committed to ensuring the integrity of both the software and the hardware throughout the project's lifecycle.
To validate the effectiveness of our solution and ensure alignment with the client's requirements, our team must subject the device to conditions resembling its intended usage environment.
Presently, the anti-theft device is optimised for mountainous terrain. However, the client seeks to broaden its applicability to encompass a wider demographic, including rural areas. As such, we will transition the testing environment to simulate a rural setting within a temperate climate.
Fortunately, our team is situated in France, providing convenient access to such conditions for replication. While our team may not be able to directly test the device in a mountainous environment, we will operate under the assumption that its performance in a temperate climate will correlate with functionality in mountainous regions, although this cannot be guaranteed.
GitHub Actions are employed for continuous integration and deployment, ensuring that tests are automatically executed with each push to the main branch. Additionally, during the development phase, the workflow is triggered on each push to the dev branch.
This setup enables us to identify any functional issues in the code, pinpoint when they occurred, and determine which changes led to them.
GitHub Projects will be utilised to compile a comprehensive list of test cases along with their current status. This platform will act as a repository for unit tests, providing visibility into what requires testing, the methodologies involved, and the expected outcomes.
Leveraging GitHub Projects will significantly aid in streamlining the testing process and enhancing the overall quality of the product.
GitHub Issues serves as an integrated issue-tracking tool, facilitating the creation and management of issues while enabling assignment to team members. Primarily, Quality Assurance is responsible for generating GitHub Issues for every problem identified within the product.
Moreover, multiple templates have been created by our team to simplify the jobs of the QA as well as the developers and the users. These templates are the following: Bug Report, Document Issue.
Bug reports will be mentioned hereunder.
Document Issue template can be found here:
To ensure every feature and all possible bugs have been tested and mitigated, test cases are created and stored in GitHub Projects.
They are defined and classed by different feature names corresponding to the device and the project. The different names are the following:
- NFC
- Battery
- Bluetooth
- Trigger Mode
- Lock Mode
- Unlock Mode
- Software
- Alarm
- Low Battery Management
- Notifications
- GPRS
- Motion Detection
- GPS
- Security
The test cases would follow the template described hereunder:
{Name Of The Feature}:
{Name Of The Test Case 1}{Failed/Passed}{Error Related}{Testing Status}{Priority}{Test Size}{Start Date}{End Date}
{Name of the test case 2}{Failed/Passed}{Error Related}{Testing Status}{Priority}{Test Size}{Start Date}{End Date}
Moreover, when the name of the test case is clicked, a new window opens with more information such as:
- Description of the test;
- Pre-conditions;
- Steps to realise it;
- Expected result.
It would follow the next template:
{Name Of The Test Case}:
## Description
*text*
## Pre-conditions
*list*
## Steps
*list*
## Expected Result
*text*
The test cases are divided into many scroll-down menus and can be organised according to the one you want to see. The scroll-down menus are composed of labels, they are all defined in the table below.
Failed/Passed | Error Related | Testing Status | Priority | Test Size |
---|---|---|---|---|
- Testing | - Syntax | - Done | - Low | - S |
- Passed | - Hardware | - Doing | - Medium | - M |
- Failed | - Software | - Will Do | - High | - L |
- Hardware/Software | - Won't Do | - Critical | - XL | |
- None | - Pending | - XXL |
Unit tests play a crucial role in validating the functionality of individual components or modules within the software. These tests are conducted in isolation to confirm that each unit behaves as expected.
In our project, unit tests are developed using C++ and executed using the Arduino IDE, which aligns with the language and platform driving the project forward. They are created by the software engineer of the team with quality assurance.
There will be no particular template for the unit tests due to their originality and suitability to their own modules.
Once the product hits the market, one of the most crucial testing phases kicks off. The product will face real-world conditions, potentially revealing bugs or issues that our team might have missed during development.
To address these challenges, our Technical Writer will provide a link to our GitHub repository in the User Manual. This link will grant users access to the "Issues" section, where they can review known issues and submit new ones if necessary.
We've prepared a bug report template, which we'll outline in detail later in this document.
Gathering extensive feedback from users once the product is launched is of utmost importance. This feedback will play a crucial role in identifying and rectifying errors within the product, ultimately enhancing its efficiency for future iterations.
Communication between bug reporters and our QA team will be facilitated through the comments section within each issue. This allows our team to request additional information if necessary, expanding our troubleshooting capabilities.
Once the bug and its solution have been clearly defined by both the user and the QA team, it becomes the responsibility of the development team to rectify and eliminate bugs from the program.
When a bug is identified by the Quality Assurance team, they will promptly generate a GitHub issue within the project's repository.
This practice streamlines the developer's workflow by providing them with a comprehensive and articulate description of the bug.
From the title to the step-by-step instructions, clarity and precision are paramount to ensure the developer team fully grasps the nature of the issue and the necessary actions for resolution.
This meticulous approach enhances the overall quality of the product.
To facilitate this process, a standardised template has been devised to optimise the quality and simplicity of bug reports.
It can be found here.
Here's what the template looks like when opening a new Bug report related issue:
After the resolution of the bug, the development team is responsible for updating the initial bug report to indicate that it has been fixed.
Following verification and confirmation of the bug fix's effectiveness, the issue will be closed.
This systematic approach ensures that all stakeholders are informed of the bug's status and promotes transparency throughout the resolution process.
But is also a way to keep track of the progress and to ensure the quality of the product.
These criteria define when testing activities should be halted.
These criteria are established to ensure that testing resources are effectively utilised and that potential risks or issues are addressed before proceeding further.
If a task essential to the critical path remains incomplete, testing activities will be suspended until the task is successfully executed.
The critical path, as its name implies, represents the most crucial tasks in the project. Failure to complete these tasks halts the entire project's progress. Therefore, if a critical path task is not finished, the project as a whole cannot be completed.
In the event of identifying a critical bug during testing, all other testing activities must be paused to prioritise the resolution of this issue. A critical bug can lead to software crashes or severe malfunctions, significantly impacting user experience.
Prompt resolution is imperative to maintain the integrity of the software.
If a critical bug is detected, the testing team must dedicate their efforts to addressing and rectifying it before resuming any further testing. Failure to resolve such issues could compromise the software's stability and render it unsuitable for release.
Once the critical bug has been resolved, testing activities can resume.
If a substantial number of bugs are discovered in the software, testing operations will be paused, and the QA team will promptly notify the development team. During this period, the QA team will refrain from altering any code, enabling the development team to address these issues.
Once the development team has resolved the bugs, testing activities can resume. This approach ensures that the software is thoroughly tested and that all identified issues are resolved before proceeding to the next phase.
If significant challenges arise within the testing environment, such as hardware malfunctions or software compatibility issues, testing activities will be temporarily suspended until these challenges are addressed and resolved.
If any issues arise with the Arduino IDE or other software utilised by the QA team, testing activities will be halted until these issues are effectively resolved.
If the stakeholder (client) directs the QA team or the team to suspend any activities for any given reason, our team will comply with these directives.
Entry criteria are prerequisites that must be fulfilled before testing commencement. They guarantee the testing process's effectiveness and efficiency.
These criteria necessitate clear definition, team consensus, and understanding among testers to ensure seamless execution.
The specified criteria include:
- Conclusion of the coding phase (for a feature);
- Development, implementation, and execution of unit tests;
- Establishment of a functional and specified test environment and strategy;
- Defined and clear test cases.
Exit criteria are the predefined conditions that signify when testing activities can be concluded.
They serve as benchmarks to assess whether the testing objectives have been met and whether the software system is ready for the next phase or release.
By adhering to these criteria, our team ensures that testing is terminated without compromising the quality or efficacy of the software.
Before we can finalise the testing phase and prepare the product for distribution, certain critical objectives must be met.
- Shock detection accuracy: 99%
- Detection level accuracy (small or major): 99%
- Unlock: 99%
- Alarm: 98%
- Shock notification: 95%
- GNSS position acquisition and transmission: 80%
Battery operating time between two charges
- 7 days operating duration
- Considering 6 hours in activation mode
The software is required to adhere to both the functional and technical specifications as outlined in the project documentation.
To deem a feature as complete, it must not only meet the specified technical requirements but also fulfill the client's expectations.
During the testing phase, our team will consistently reference the specifications to verify that the software aligns with the client's needs and requirements.
The testing phase will only be concluded once all specifications have been successfully met.
-
Documents: 100% completion
- Functional Specifications
- Technical Specifications
- User Manual
- Test Plan
- Management Documents
-
The documentation should be clear and concise, comprehensible to external parties involved in and out of the project, whether technical or non-technical. Furthermore, the document should maintain consistency in terms of format throughout.
- Lenovo Thinkbook 14
- Windows 11 Pro
- 14-inch (1920 x 1080)
- Processor: Intel(R) Core(TM) i7-1065G7 CPU @ 1.30GHz
- RAM: 16.0 GB
- System type: 64-bit operating system, x64-based processor
- MacBook Air 2020
- 13.3 inch (2560 x 1600)
- macOS Ventura 13.0
- Apple M1 Chip
-
- Linux 6.1.0-18, Debian 12
- 14-inch (1920 x 1080)
- Processor: Intel(R) Core(TM) i7-1065G7 CPU @ 1.30GHz
- RAM: 16.0 GB
- System type: 64-bit operating system, x64-based processor
-
Lenovo Ideapad Slim 1-14AST-05
- Ubuntu 22.04.4 LTS x64
- Processor: AMD® A4-9120e Radeon R3
- RAM: 4.0 GB
- C++ 11.
- nRF52 Assembly.
- Arduino IDE & Compiler v2.3.3.
list of dependencies:
- NRF52_MBED_TimerInterrupt V1.4.1.
- adafruit-nrfutil 0.5.3 (for Linux).
- ArduinoBLE V1.3.6.
- Sim800L HTTP connector V1.14.0.
- Seeed Arduino LSM6DS3 V2.0.3.
- OneWire V2.3.7.
- FreeRTOS V11.0.1-5.
- Xiao BLE Sense nrf52840.
- GSM/2G SIM800L Module.
- NFC antenna.
- 3.7V, 1100mAh lithium battery.
- 12V buzzer.
- 12V, 500mA Electromagnet.
- LSM6DS3 (Accelerometer).
-
SportShield App:
- Version 1.0
-
- Android 11, MIUI 12.5
- Processor: MediaTek Helio G88
- RAM: 4.0 GB
Task | Start date | End date | Estimated duration |
---|---|---|---|
Issue/ Pull Request Templates | March 11, 2024 | March 11, 2024 | 1 day |
Functional Specifications Review | March 15, 2024 | March 18, 2024 | 2 days |
Technical Specifications Review | March 21, 2024 | March 26, 2024 | 3 days |
Test Plan Creation | March 22, 2024 | April 10, 2024 | 19 days |
GitHub Actions | March 26, 2024 | April 4, 2024 | 9 days |
Test Cases Definition | March 26, 2024 | March 29, 2024 | 3 days |
First meeting With Team 5 & 7 QA | April 2, 2024 | April 2, 2024 | 1 day |
Second meeting With Team 5 & 7 QA | April 8, 2024 | April 8, 2024 | 1 day |
User Manual Review | April 8, 2024 | April 10, 2024 | 2 days |
The initial deliverable, the Test Plan document, will delineate the testing strategy, scope, and criteria for the project.
This document will function as a comprehensive guide for the QA team, as well as for future iterations, ensuring that all testing activities align with the established strategy.
The second deliverable, Test Cases, will be stored in GitHub Projects. These documents will offer an exhaustive compilation of test cases corresponding to each feature.
Bug Reports, the third deliverable, will be generated by the QA team upon receiving reports of bugs. These reports will be documented in the GitHub Issues section, furnishing comprehensive descriptions of the bugs and the required steps for resolution.
Each report will encapsulate the bug's summary, its underlying cause, and the steps necessary to replicate it. This approach ensures a streamlined and lucid overview of the bugs encountered during testing.
Bug Data Reports will be stored in a Markdown file within the project's repository. These reports will provide a detailed overview of the bugs identified during testing, including their severity, resolution status, and the steps taken to rectify them.
-
QA: Quality Assurance. The process of ensuring that a product or service meets specified quality standards and requirements.
-
UAT: User Acceptance Testing. The final phase of testing in which the software is tested in a real-world environment by the end users.
-
NFC: Near Field Communication. A technology that enables two devices to communicate with each other when they are nearby.
-
BLE: Bluetooth Low Energy. A wireless communication technology that allows devices to communicate over short distances.
-
GitHub Actions: A feature of GitHub that enables automated workflows for software development tasks, such as continuous integration and deployment.
-
GitHub Projects: A project management tool integrated into GitHub for organising and prioritising tasks, issues, and pull requests.
-
GitHub Issues: A built-in issue-tracking tool in GitHub used for reporting, tracking, and resolving bugs, enhancements, and other tasks.
-
Test case: A set of conditions or variables under which a tester will determine whether a system under test satisfies requirements or works correctly.
-
Client's Reliability Indicators: Specific metrics or benchmarks defined by the client to evaluate the reliability and performance of the software.
-
Test deliverables: Documents or artifacts produced as a result of the testing process, such as test plans, test cases, and bug reports.
-
Integrated Development Environment (IDE): is a software application that provides comprehensive tools and features for software development, typically including a source code editor, build automation tools, debugger, and other utilities, all integrated into a single user interface.
-
Arduino: An open-source electronics platform based on easy-to-use hardware and software. It is used to create interactive objects or environments.