Skip to content

Latest commit

 

History

History
52 lines (42 loc) · 3.15 KB

README.md

File metadata and controls

52 lines (42 loc) · 3.15 KB

Micro

Team names: Chao Zhu, Carlos Carbajal, Song Zhang, Han Kim

Overview

In 2003, SharePoint was chosen to replace Lotus Notes as Microchip’s Intranet platform. The new Intranet site, Mchpweb, was introduced to the business users with modest beginnings as a simple portal that gave users access to different department sites and various service tools. As Microchip continued to grow in size, business unit, and function, more information was jumbled on existing pages, with the hope that providing a lot of different information would mean that something was relevant to someone. Not having a dedicated development team to release new and improved tools and the absence of an editorial group to provide relevant and current content information further hampered Mchpweb’s usability and user adoption. The following page is a partial screen shot of the current Mchpweb home page which could greatly benefit from better space utilization and more stylish content presentations.

##Getting Started ###Meetings

  • Jan. 21: Meeting w/ Louise Tung, form the team, get brief introduce from Microchip
  • Jan. 26: Meeting w/ Louise, show our drawing mockups, set time for next meeting, and goal
  • Feb. 04: Meeting w/ Louise, get a simple mockup, shows the webpage, and get more files for webpage
  • Feb. 11: Meeting w/ Louise, determined tools to be used to develop intranet. Set development environment accounts
  • Feb. 25: Meeting w/ Louise, test dummy setup pages, determine metadata for database for the conference room finder and wiki acronym search
  • Mar 11: Meeting w/ Louise, Test MicroWiki, create acronyms in microwiki, talk about implementing world clock
  • Mar 24-25: Get feedback from Louise via email, feedback on worldclock, enhanced conference room finder
  • Apr 1: Meeting with Louise. Generated excel test document with Louise

##To-do List Stories in Ready

  1. Release 0.1 – Jan 29: Create mockups for

    • Mchpweb Intranet site: determine template layout, look/feel style
    • Acronym wiki page: page layout and features
    • Conference room finder: page layout and features
  2. Release 0.2 – Feb 12:

    • Determine tools to be used for the home page, wiki page, and conference room finder
    • Set up accounts and development environment
    • List Intranet home page components and groupings
  3. Release 0.3 – Feb 26:

    • Create unpolished Mchpweb home page and conference room finder, and possibly wiki page
    • Gather sample data for home page components, acronyms, and conference room listing/info, map
  4. Release 0.4 – Mar 12: Create a Youtube video to ????

  5. Release 0.5 – Mar 26:

    • Features demo
    • Determine components to keep for the final product
  6. Release 0.6 – Apr 9:

    • Test and bug fix
    • Documentation
    • Determine and create test cases
    • Run automated test cases (what type of automated test tool?)
  7. Release 1.0 – Apr 28:

    • Final product demo
    • Final demo and report documentation