-
Notifications
You must be signed in to change notification settings - Fork 0
/
app.py
108 lines (88 loc) · 4.21 KB
/
app.py
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
import argparse
import logging
import os
import tempfile
from clams import ClamsApp, Restifier
from mmif import Mmif, View, Document, AnnotationTypes, DocumentTypes
from typing import Union, Dict
import metadata
import bacs
class BrandeisAcs(ClamsApp):
PATH_ESCAPER = '+'
SEGMENTER_ACCEPTED_EXTENSIONS = {'.mp3', '.wav'}
def _appmetadata(self):
pass
def _annotate(self, mmif: Union[str, dict, Mmif], **parameters) -> Mmif:
if not isinstance(mmif, Mmif):
mmif = Mmif(mmif)
config = self.get_configuration(**parameters)
# get AudioDocuments with locations
docs = [document for document in mmif.documents
if document.at_type == DocumentTypes.AudioDocument
and len(document.location) > 0
and os.path.splitext(document.location)[-1] in self.SEGMENTER_ACCEPTED_EXTENSIONS]
files = [document.location_path() for document in docs]
# key them by location
docs_dict: Dict[str, Document] = {self.escape_filepath(doc.location_path()): doc for doc in docs}
segmented, lengths = self.run_bacs(files)
for filename, segmented_audio, total_frames in zip(files, segmented, lengths):
v: View = mmif.new_view()
self.sign_view(v, config)
v.new_contain(AnnotationTypes.TimeFrame,
timeUnit=metadata.timeunit,
document=docs_dict[self.escape_filepath(filename)].id)
speech_starts = sorted(segmented_audio.keys())
if speech_starts[0] > 0:
v.new_annotation(AnnotationTypes.TimeFrame, start=0, end=speech_starts[0] - 1, frameType='non-speech')
nonspeech_start = None
for speech_start in speech_starts:
if nonspeech_start is not None:
nonspeech_end = speech_start - 1
v.new_annotation(AnnotationTypes.TimeFrame, start=nonspeech_start, end=nonspeech_end, frameType='non-speech')
speech_end = segmented_audio[speech_start]
nonspeech_start = speech_end + 1
v.new_annotation(AnnotationTypes.TimeFrame, start=speech_start, end=speech_end, frameType='speech')
if nonspeech_start < total_frames:
v.new_annotation(AnnotationTypes.TimeFrame, start=nonspeech_start, end=total_frames, frameType='non-speech')
return mmif
def escape_filepath(self, path):
return path.replace(os.sep, self.PATH_ESCAPER)
def run_bacs(self, files: list) -> (list, list):
temp_dir = tempfile.TemporaryDirectory()
segmented = []
audio_length = []
for f in files:
if os.path.exists(f):
os.symlink(f, os.path.join(temp_dir.name, self.escape_filepath(f)))
else:
raise FileNotFoundError(f)
model = bacs.classifier.load_model(bacs.defmodel_path)
for wav in bacs.reader.read_audios(temp_dir.name):
predicted = bacs.classifier.predict_pipeline(wav, model)
smoothed = bacs.smoothing.smooth(predicted)
speech_portions, total_frames = bacs.writer.index_frames(smoothed)
speech_portions_in_ms = {}
ms_multiplier = bacs.feature.FRAME_SIZE
for s, e in speech_portions.items():
speech_portions_in_ms[s * ms_multiplier] = e * ms_multiplier
segmented.append(speech_portions_in_ms)
audio_length.append(total_frames * ms_multiplier)
temp_dir.cleanup()
return segmented, audio_length
if __name__ == "__main__":
parser = argparse.ArgumentParser()
parser.add_argument("--port", action="store", default="5000", help="set port to listen" )
parser.add_argument("--production", action="store_true", help="run gunicorn server")
# add more arguments as needed
# parser.add_argument(more_arg...)
parsed_args = parser.parse_args()
# create the app instance
app = BrandeisAcs()
http_app = Restifier(app, port=int(parsed_args.port))
# for running the application in production mode
if parsed_args.production:
http_app.serve_production()
# development mode
else:
app.logger.setLevel(logging.DEBUG)
http_app.run()