-
Notifications
You must be signed in to change notification settings - Fork 1
Data Processing Pipeline
Ding Ma edited this page Nov 5, 2020
·
3 revisions
As students, we would like to reduce the cost as much as possible. We figured out through testing that an E2 micro instance works for our scrapper.
- VMs:
- E2 Micro instance (2 vCPU, 1GB RAM)
- OS: Container optimized
- Storage: 10GB persistent
- Cloud function: serverless function set to 216mb of RAM. It gets triggered when there is an upload to the bucket.
- Cloud Storage: 5GB located at us-east1 (South Carolina).
- VMs: 0.009$/h per instance. We are using four so total of ~25$/h.
- Function: Very generous tier, we don't expect going over it.
- Storage: Free 5GB, we don't expect to go other it either.
Total cost: Around 25$/month if the scrappers run 24/7.