多节点模型中coal-ppl不发电,不知道是哪里出问题了 #846
Replies: 9 comments 9 replies
-
是不是还有一种可能就是我的需求太小了?轮不到煤电发电?但是全国所有煤电都没发电量,这个应该不可能吧? @yiyi1991 |
Beta Was this translation helpful? Give feedback.
-
Thank you for moving your questions here in discussion and closing your previous technical issue. As suggested earlier, probably first try checking the
(My current suspicion is that all Then consider checking region, price, and extraction AFTER you have checked input and output, because you should have ACT levels in your technologies even without them (as shown in blocks 1-3 here). What is your ultimate purpose for this MESSAGE run? |
Beta Was this translation helpful? Give feedback.
-
I will then suggest getting in contact with researchers who have been working on MESSAGE China for a longer time. Check this with power sectors and this with province-level modeling. And other researchers in the author lists in related works (e.g., sub-regional coal here), to see if there is a more accessible baseline you can use as an intermediate research input to build your scenarios on.
I saw hydro_* you added has non-zero levels in your gdx output, which is great. Your model is well-built and solved.
It looks good (and since you have some hydropower levels, it should be good).
So the problem now is, the technologies that you have given them resource inputs show zero activity? You then suspect that these zeros are caused by technical issues when adding parameters OR just a result of the system preferring hydro? But at the end the 1st point should solve your problem most directly. |
Beta Was this translation helpful? Give feedback.
-
Can you give the definition of your "燃料成本"? |
Beta Was this translation helpful? Give feedback.
-
Great.
I think yes, if you take care of the corresponding resource costs, keep the single technology aligned with other technologies, and change the corresponding unit in reporting. I have not tested it on the supply-side technologies by myself but at the end the optimization happens at the activity level (the levelized system cost per unit of activity).
Minimizing costs is the core of this optimization model. Of course, one can set the |
Beta Was this translation helpful? Give feedback.
-
I guess you misread the model year and the vintage year? |
Beta Was this translation helpful? Give feedback.
-
Yes, See core formulation here. |
Beta Was this translation helpful? Give feedback.
-
You mean that you observed the capacity variables kept at a specific level, which does NOT equal the up (or low) limit you set for their boundaries? (To me this 15.25 looks like the system prefers the cheapest hydropower and used up all its available capacity in each period, which is the bound_total_capacity_up you set for them.) Please check the differences of bound_new_capacity_up/lo, bound_total_capacity_up/lo, growth_new_capacity_up/lo. Hope that can help. Again, please consider contacting the researchers I mentioned here previously.
|
Beta Was this translation helpful? Give feedback.
-
Based on this log I see the model failed to reach the desirable 13.086 level for the commodity Are there any additional constraints that stay in the way of the technologies that consume the commodity (For the former, maybe there is a |
Beta Was this translation helpful? Give feedback.
-
在运行全国省份节点模型的时候,我采用excel输入方式,添加的商品有煤电、铀、电力,层级resource、primary、secondary、final,但发现在Excel中把ext-coal添加上去,在gdx文件中没有ext的数据,我想问一下关于price-commdity这个是外生数据?还是模型计算得到的?如何更改这个这个数据?关于成本的有三种投资、运维、可变,都与这个price-commdity有关吗?谢谢诶您的解答 @lumbric
@yiyi1991https://github.com/yiyi1991我还尝试过没有加ext开采技术,然后把commidity都变成electricity但也是没有发电量,不知道该如何去解决
Beta Was this translation helpful? Give feedback.