It would be awesome if it would be possible to group the tasks by their resources. Currently every task will be shown underneath, even if they are done by the same resource.
E.g.
1 row for "Jake" with the tasks: wake, teeth
1 row for "Peter" with the tasks: wake
1 row for "John" with the tasks: wake, shower
So I can see directly, which resource got free capacity (= empty space) or which resource is overloaded (full of bars). Like in other planning tools.
In my example, the task "packaging" will be done by the logistics guy. It would be great if both tasks would be in the same row:
The text was updated successfully, but these errors were encountered:
It would be awesome if it would be possible to group the tasks by their resources. Currently every task will be shown underneath, even if they are done by the same resource.
E.g.
1 row for "Jake" with the tasks: wake, teeth
1 row for "Peter" with the tasks: wake
1 row for "John" with the tasks: wake, shower
So I can see directly, which resource got free capacity (= empty space) or which resource is overloaded (full of bars). Like in other planning tools.
In my example, the task "packaging" will be done by the logistics guy. It would be great if both tasks would be in the same row: