Notifications
You must be signed in to change notification settings - Fork 0
/
Copy pathjwst_commis_timeline_visualize_asrun_endcommis.py
77 lines (62 loc) · 3.51 KB
/
jwst_commis_timeline_visualize_asrun_endcommis.py
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
from matplotlib import patches
from matplotlib import pyplot as plt
from matplotlib.ticker import ScalarFormatter, FuncFormatter, MultipleLocator
import pandas
import numpy as np
''' This python script makes a graphical visualization of the JWST commissioning timeline.
It reads a short list of events from an excel file, and plots them. jrigby, Jan 2020.
jrigby updating May 2022 to as-run in commissioning'''
def stem_and_label(xs, ys, labels, labelsize, bottom=0.7):
plt.stem(xs, ys, use_line_collection=True, bottom=bottom, basefmt=' ')
for ii, label in enumerate(labels):
xoff = 0 ; yoff=0.05
plt.annotate(label, xy=(xs[ii]+xoff, ys[ii]+yoff), fontsize=labelsize[ii])
return(0)
plt.ion()
fig, ax = plt.subplots(figsize=(18,6))
fs0 = 14 ; fs1 = 14 ; fs2 = 20 ; fs3=24; fs4=30 # shortcuts for Font sizes
ys = [1, 2, 3, 4, 5]
y_label = 0.2
t_deploy = 25.2
t_startOTE = 33.7
t_endOTE = 116.0
t_end_SI = 197. # commissioning ended on July 10 2022, when NIRCam coronagraphy was approved. # 180.
day = np.arange(0,t_end_SI +0.01 ,1)
plt.plot(day, np.zeros_like(day), lw=4, color='k')
# Major stages. Dates are hardcoded.
pheight = 0.7 ; lheight=0.1
patch1 = patches.Rectangle(xy=(0, 0), width=t_deploy, height=pheight, fill=True, color='C0') # Deploy #blue
patch0 = patches.Rectangle(xy=(t_deploy, 0), width= t_startOTE - t_deploy, height=pheight, fill=True, color='grey') # Cooldown, grey
patch2 = patches.Rectangle(xy=(t_startOTE, 0), width=t_endOTE - t_startOTE, height=pheight, fill=True, color='C1') # OTE commis
patch3 = patches.Rectangle(xy=(t_endOTE, 0), width=t_end_SI - t_endOTE, height=pheight, fill=True, color='C2') # SI commis
ax.get_xaxis().set_major_locator(MultipleLocator(20))
plt.xlabel("Days after launch", fontsize=fs3)
plt.xticks(fontsize=fs2)
ax.xaxis.set_tick_params(width=2, length=10)
for patch in (patch1, patch2, patch3, patch0) :
ax.add_patch(patch)
plt.annotate("Deploy", xy=(2, y_label), fontsize=fs4)
plt.annotate("cooling", xy=(25.1, y_label), fontsize=fs1)
plt.annotate("Telescope commissioning", xy=(37, y_label), fontsize=fs4)
plt.annotate("SI commissioning", xy=(130, y_label), fontsize=fs4)
plt.plot((132.2, 146.2), (2,2), ls='-', color='k') #draw line for thermal characterization
df = pandas.read_excel("events_endcommis.xlsx") # Grab an excel file with a short list of events, time, and label sizes
df['fontsize'] = df['labsize']
#stem_and_label(df['day'], df['height'], df['event'], df['labsize'], bottom=pheight) # PLANNED
stem_and_label(df['elapsed_day_actual'], df['height'], df['event'], df['labsize'], bottom=pheight) # ACTUAL
#### Will need to update these to day_actual as events unfold***
# hot/cold thermal slews from 132.5d to 153d. Hatch this region
plt.rcParams['hatch.linewidth'] = 3
thermalslew_begin = 132.2 # hardcoded # started 5/6/2022
thermalslew_end = 146.2 # hardcoded # ended May 20 2022
thermalslew_width = thermalslew_end - thermalslew_begin
bar = ax.bar(x=thermalslew_begin, height=pheight, width=thermalslew_width, bottom=0, align='edge', fill=False, hatch='//', edgecolor='darkgrey')
plt.ylim(-0.2, 3.5)
plt.tight_layout()
# Hide the frame of the plot and the y axis
ax.set_frame_on(False)
plt.yticks([])
plt.annotate("[email protected], at end of commissioning" , xycoords='figure fraction', xy=(0.7,0.03), fontsize=fs0)
fig.savefig("jwst_visual_commis_timeline_jrigby_asrun_endcommis.pdf")
#plt.annotate("[email protected]" , xycoords='figure fraction', xy=(0.7,0.03), fontsize=fs0)
#fig.savefig("jwst_visual_commis_timeline_jrigby_nodate.pdf")