Engineering Practices

Definition of Done

  • Code changes reviewed & signed off
  • Existing documentation is updated (readme, .md's)
  • New documentation needed to support the change is created
  • Code changes checked into main
  • All existing automated tests (unit and/or e2e) pass successfully, new tests added as needed
  • CI completes successfully
  • CD completes successfully
  • Smoke test production deployment for minimum of 2 weeks
  • New changes in smoke test for 48hrs (ongoing)
  • Create task for required artifacts

Engineering Playbook Definition of Done

Markdown (md files)

  • Use markdownlint add-in for VS Code
    • Repeating header lint issues are OK if avoiding would cause readability issues
  • Use Code Spell Checker add-in for VS Code
  • Use - for unordered lists
    • Mixing - and * will cause linter errors
  • Use single back-quote to call out terms
  • Add a blank line before and after ''' for visualization
  • ''' blocks must specify a language for color coding
  • Preview the MD to make sure it renders in a highly readable format
    • Avoid long headers, especially H1 and H2
      • Using a short Hx with a long call out renders better than a long Hx

use call outs to emphasize important points

Tool for Code Reviews

  • CodeFlow extension for GitHub Link

Kanban Board Management Best Practices

Triage

All net-new issues need to be triaged, leverage Notes for discussions points as needed

  • Create the issue in the appropriate repo with the appropriate template
  • Add project to the issue (i.e. Helium) - this will add to the main board
    • This is only necessary in a multi-repo project like Helium
  • Add all relevant tags (language, enhancement, bug, design review, etc)
  • Do not add Size, Priority, Milestone, or Assignee
  • All issues will be triaged at the end of the Standup call
  • Add an "undo issue" for any temporary changes that need to be removed in the future

Backlog

Once issue has been triaged, move into the Backlog

  • Once issue is triaged, add the appropriate priority label and other tags as appropriate
  • Do not add size, milestone or assignee

Sprint Backlog

Issues identified during milestone planning will be shifted into Milestone backlog

  • Need to review and update priority and add estimated sizing and milestone labels

In Progress

Issues that the Dev Team is actively working on

  • Add assignee, size, and milestone tags & ensure all relevant tags are added
  • If a design review is required, schedule meeting when moving issue to backlog
  • If task is bigger than "Size:L", break into smaller tasks to ensure completion during week sprint

PR Submitted / Review

Pull Requests to create or update code, documentation, templates, etc and issues that need reviewed

  • Complete the PR Template (ensure original issue is closed or referenced)
  • Assign reviewers, assign yourself, add Project board, and Milestone
  • If issue has multiple issue to close and/or reference, report each reference/close # on separate line to ensure correct link

Done

  • Issue is completed, no further action required
  • Ensure task checklist is complete

Burn Down

During the final sprint of the milestone, create a burn down column for issues pivotal to achieve goals