WG Core 2024-04-23 #54
emiltin
announced in
Working Groups
Replies: 0 comments
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
-
Particpants
Matti, Tapani, David, Emil
Core 3.2.2
All issues have been completed. All that's left is to update the tools, see below.
3.2.2 Tools
JSON Schemas needs to be updated.
RSMP gem: update to use new schema, change sendOnChange.
Validator: update to use new RSMP gem, update tests for sendOnChange.
Simulator: 3.2.2 PR has been merged. New 3.2.2 SXL YAML needs to be included. Changelog needs updating.
An issue has been fixed in the simulator, related to required message attributes.
New Issues
Reviewed
Signal Programming
Generation of MAP-files (intersection topology) is also a need, but there are existing formats for MAP data.
Starting simple: time plans (mode, cycle lenth, group phases), yearly schedules, object list (signal groups, detector logics), safety matrix (read-only),
Beta Was this translation helpful? Give feedback.
All reactions