You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
After doing the contributions in both phases, we should also connect the output of phase 1 with the start of phase 2, using the circuits.
This would also be a good occasion to test integration with the rest of our proving infrastructure, since we'll need to be interacting with our circuit format, among other things.
A good test here could be to try and replace our proving / verifying key generation code with code that calls out to the setup ceremony internals?
The text was updated successfully, but these errors were encountered:
Part of #712.
After doing the contributions in both phases, we should also connect the output of phase 1 with the start of phase 2, using the circuits.
This would also be a good occasion to test integration with the rest of our proving infrastructure, since we'll need to be interacting with our circuit format, among other things.
A good test here could be to try and replace our proving / verifying key generation code with code that calls out to the setup ceremony internals?
The text was updated successfully, but these errors were encountered: