The issue has P0 priority.
The issue has P1 priority.
The issue has P2 priority.
The issue has P3 priority. Assigned to backlog.
Minor issue, awaiting more evidence before prioritizing
This issue blocks a release. Please solve it ASAP.
Denotes a PR that will be considered when it comes time to generate release notes.
Denotes a PR that doesn't merit a release note.
Indicates that the PR requires an LGTM.
This PR needs to get two LGTMs before merging.
Indicates that the PR requires three LGTM.
This PR requires a follow-up task after being merged.
After cherry-picked, the cherry-picked PR requires further changes.
Indicates that the Issue or PR belongs to the community-infra SIG.
Indicates that the Issue or PR belongs to the coprocessor SIG.
Indicates that the Issue or PR belongs to the docs SIG.
Indicates that the Issue or PR belongs to the execution SIG.
Indicates that the Issue or PR belongs to the k8s SIG.
Indicates that the Issue or PR belongs to the raft SIG.
Denotes a PR that changes 100-499 lines, ignoring generated files.
Denotes a PR that changes 30-99 lines, ignoring generated files.
Changes of a medium size.
Denotes a PR that changes 10-29 lines, ignoring generated files.