Fix instance reload #608
ci.yml
on: pull_request
Spec
/
Setup Test Matrix
31s
Matrix: Spec / spec
Matrix: Acceptance / acceptance
Annotations
10 errors
Acceptance / Acceptance tests (CentOS-8, puppet7-nightly)
Process completed with exit code 1.
|
Acceptance / Acceptance tests (RedHat-8, puppet7-nightly)
Process completed with exit code 1.
|
Acceptance / Acceptance tests (AlmaLinux-8, puppet8-nightly)
The job running on runner GitHub Actions 77 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (AlmaLinux-8, puppet8-nightly)
The operation was canceled.
|
Acceptance / Acceptance tests (Rocky-8, puppet8-nightly)
The job running on runner GitHub Actions 425 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (Rocky-8, puppet8-nightly)
The operation was canceled.
|
Acceptance / Acceptance tests (Rocky-8, puppet7-nightly)
The job running on runner GitHub Actions 91 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (Rocky-8, puppet7-nightly)
The operation was canceled.
|
Acceptance / Acceptance tests (AlmaLinux-8, puppet7-nightly)
The job running on runner GitHub Actions 375 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (AlmaLinux-8, puppet7-nightly)
The operation was canceled.
|