You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
So far in modify_final_network HVDC links and hydrogen pipelines to non European partners are built from scratch every planning horizon. This does not reflect reality since connections built in 2030 are a prerequisite for the network 2035.
To reflect this, those links have to have a build_year, a unique index with the build_year as well as a lifetime.
The text was updated successfully, but these errors were encountered:
So far in
modify_final_network
HVDC links and hydrogen pipelines to non European partners are built from scratch every planning horizon. This does not reflect reality since connections built in 2030 are a prerequisite for the network 2035.To reflect this, those links have to have a build_year, a unique index with the build_year as well as a lifetime.
The text was updated successfully, but these errors were encountered: