Notifications
You must be signed in to change notification settings - Fork 3
/
startupandpartial.mod
281 lines (229 loc) · 10.2 KB
/
startupandpartial.mod
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
# STARTUP & PARTIAL: a simple LP formulation of variable conversion efficiency
# Last updated: 18 Nov 2016
# Author: [email protected]
# License: CC0 <http://creativecommons.org/publicdomain/zero/1.0/>
#
# USAGE
# glpsol -m startupandpartial.mod
#
# OVERVIEW
# This linear programming (LP) optimisation model finds a minimum-cost
# capacity expansion and unit commitment solution to a given demand
# timeseries for two sources of energy:
#
# A. fluctuating renewable energy source (RES), e.g. a wind park or solar farm
# with investment, but without variable costs
# B. controllable power-plant (PP), e.g. coal or gas plant
# with investment, fuel and startup costs and partial load efficiency
#
#
# Fig. 1 Power system diagram
#
# Wind Fuel Electricity
# | | |
# | | +-----+ |
# +------------>| RES |----->+
# | | +-----+ | ,-----------------.
# | | +--->( Demand timeseries )
# | | +-----+ | `-----------------'
# | +------>| PP |----->+
# | | +-----+ |
# | | |
#
# The output of the RES power source is determined by the parameter wind[t] and
# the variable wind park capacity capacity_res.
# The output of the power-plant PP is controllable by the solver, but incurs
# costs for
# - installing a certain capacity in the first place (cost_invest, EUR/MW)
# - buying fuel to burn (cost_fuel, EUR/MWh) and
# - starting up the plant (cost_startup, EUR/MW).
#
# The latter cost is coupled to a strict LP formulation of the power plant
# conversion efficiency which depends on the operation point, i.e. which
# fraction of the "online capacity" is actually used. It bundles together the
# following behaviours:
# - minimum partial load: PP must output at least a fraction partial_min of
# its online capacity
# - startup costs: increasing the online capacity leads to startup costs, while
# decreasing is for free
# - partial load efficiency: efficiency at full operation (output equals online
# capacity) happens at full efficiency (efficiency_max) while operation at
# minimum partial load (output equals partial_min of current online capacity)
# happens with minimum efficiency (efficiency_min). In between, a linear
# interpolation is valid which leads to a non-linear effective efficiency
# behaviour.
#
# In practice, probably only the two extreme operation points "maximum load" and
# "minimum partial load" are to be used. While the partial load efficiency makes
# it cheaper (fuel-wise) to always have the online capacity follow the PP
# output, the startup cost provide an incentive in the other direction.
#
# SETS & PARAMETERS
# time
param N; # number of time steps
set time within 1..N; # time steps
# economics
set cost_types := {'invest (res)', 'invest (pp)', 'startup', 'fuel'};
param cost_invest; # (EUR/MW) power-plant investment costs
param cost_fuel; # (EUR/MWh) power-plant fuel costs
param cost_startup; # (EUR/MW) power-plant startup costs
param cost_res; # (EUR/MW) renewable investment costs
# power-plant parameters
param efficiency_min; # (1) power-plant efficiency at minimum operation point
param efficiency_max; # (1) power-plant efficiency at maximum operation point
param partial_min; # (1) minimum operation point, relative to plant capacity
# timeseries
param demand{t in time} >= 0; # (MW) electricity demand
param wind{t in time} >= 0; # (1) normalised wind capacity factor
# VARIABLES
# capacities
var capacity_pp >= 0;
var capacity_res >= 0;
# power plant timeseries
var pp_inp{t in time} >= 0; # (MW) power-plant input power, i.e. fuel consumption
var pp_out{t in time} >= 0; # (MW) power-plant output power, i.e. elec generation
var cap_online{t in time} >= 0; # (MW) power-plant online capacity, i.e. activity
var cap_start{t in time} >= 0; # (MW) power-plant startup capacity
var res_out{t in time} >= 0; # (MW) RES fluctuating electricity output
# costs
var costs{ct in cost_types}; # (EUR) cost by type (invest, startup, fuel)
# OBJECTIVE
# total cost: sum of all costs by cost type
minimize obj: sum{ct in cost_types} costs[ct];
# invest (pp): PP capacity multiplied by PP investment cost parameter
s.t. def_costs_invest_pp:
costs['invest (pp)'] = cost_invest * capacity_pp;
# invest (res): RES capacity multiplied by res investment cost parameter
s.t. def_costs_invest_res:
costs['invest (res)'] = capacity_res * cost_res;
# startup cost: total startup capacity multiplied with startup cost parameter
s.t. def_costs_startup:
costs['startup'] = cost_startup * sum{t in time} cap_start[t];
# fuel costs: total power-plant input multiplied with fuel cost parameter
s.t. def_costs_fuel:
costs['fuel'] = cost_fuel * sum{t in time} pp_inp[t];
# CONSTRAINTS
# demand must be satisfied from either power-plant or RES output
s.t. res_demand{t in time}:
demand[t] <= pp_out[t] + res_out[t];
# RES output is determined by product of RES timeseries and RES capacity
s.t. def_res_out{t in time}:
res_out[t] = wind[t] * capacity_res;
# Power-plant output can in principle be chosen as desired, but is interlocked
# into multiple constraints...
# ... the first: the output is limited by the 'online' capacity, roughly
# corresponding to the power-plant temperature
s.t. res_pp_out_max_by_capacity_online{t in time}:
pp_out[t] <= cap_online[t];
# second, the output may not be lower than the minimum partial load fraction of
# the online capacity
s.t. res_pp_out_min_by_capacity_online{t in time}:
pp_out[t] >= cap_online[t] * partial_min;
# changes in the online capacity are to cause startup costs. These are triggered
# by the startup capacity variable, which must become positive whenever the
# online capacity increases (but not when it decreases!)
s.t. def_pp_startup{t in time}:
cap_start[t] >= cap_online[t] - (if t > 1 then cap_online[t-1] else 0);
# the online capacity is limited by the total installed power-plant capacity
s.t. res_pp_cap_online{t in time}:
cap_online[t] <= capacity_pp;
# finally, the fuel consumption of the power-plant is determined. This unhandy
# expression is a linear interpolation to achieve a non-constant fuel
# efficiency that ranges from efficiency_min when in partial operation
# (pp_out == partial_min * cap_online ) up to efficiency_max when in full
# operation (pp_out == cap_online):
#
#
# Fig. 2 Power-plant input over power-plant output for partial load efficiency
#
# ^ pp_inp
# cap_online |
# ---------- + ,+
# eff_max | ,--'
# | ,--'
# p_min*c_onl | ,--'
# ----------- + +'
# eff_min |
# |
# |
# +-----+--------------+-------> pp_out
#
# partial_min * cap_online
# cap_online
#
#
# This expression is the "compiled" version of the resulting interpolation
# expression, followed by some algebra to simplify the expression.
s.t. res_pp_partial_efficiency{t in time}:
pp_inp[t] = (
(efficiency_max - efficiency_min) * partial_min * cap_online[t] +
(efficiency_min - partial_min * efficiency_max) * pp_out[t]
) / (
(1 - partial_min) * efficiency_min * efficiency_max
);
# SOLVE
solve;
# REPORTING PARAMETERS
param total_demand := sum{t in time} demand[t];
param total_cost := sum{ct in cost_types} costs[ct];
param share_pp := (sum{t in time} pp_out[t]) / total_demand;
param total_overprod := (
sum{t in time} (
pp_out[t] + res_out[t] - demand[t])
) / total_demand;
param pp_efficiency{t in time} :=
if pp_inp[t] > 0 then pp_out[t] / pp_inp[t] else 0;
# REPORT PRINTING
printf "\n\nCOSTS\n\n";
printf " %-17s %8s\n", "type", "EUR";
printf " --------------------------\n";
printf {ct in cost_types}
" %-17s %8.1f\n", ct, costs[ct];
printf " --------------------------\n";
printf " %-17s %8.1f\n", "sum", total_cost;
printf "\n\nSTATISTICS\n\n";
printf " %-24s %-5s %-12s\n", "indicator", "value", "unit";
printf " -----------------------------------\n";
printf " %-24s %5.1f %-12s\n", "peak demand", max{t in time} demand[t], "(MW)";
printf " %-24s %5.1f %-12s\n", "power-plant cap", capacity_pp, "(MW)";
printf " %-24s %5.1f %-12s\n", "res capacity", capacity_res, "(MW)";
printf " %-24s %5.1f %-12s\n", "share power-plant", 100 * share_pp, "(%)";
printf " %-24s %5.1f %-12s\n", "share res", 100 * (1 - share_pp), "(%)";
printf " %-24s %5.1f %-12s\n", "overproduction res", 100 * total_overprod, "(%)";
printf "\n\nSCHEDULE\n\n";
printf " %-2s %3s = %4s + %-4s %4s %3s %3s\n",
"t", "dem", "res", "pp_o", "pp_i", "onl", "eff";
printf " ------------------------------------\n";
printf {t in time}
" %-2s %3g %1s %4g + %4g %4g %3g %3d\n",
t,
demand[t],
if demand[t] < res_out[t] + pp_out[t] then "<" else "=",
round(res_out[t], 1),
round(pp_out[t], 1),
round(pp_inp[t], 1),
round(cap_online[t], 1),
100 * pp_efficiency[t];
printf "\n\n";
# DATA
data;
# economic parameters
param cost_invest := 100; # (EUR/MW) power-plant investment costs
param cost_fuel := 80; # (EUR/MWh) power-plant fuel costs
param cost_startup := 120; # (EUR/MW) power-plant startup costs
param cost_res := 150; # (EUR/MW) renewable investment costs
# power-plant parameters
param efficiency_max := 0.50; # (1) power-plant efficiency at minimum operation point
param efficiency_min := 0.40; # (1) power-plant efficiency at maximum operation point
param partial_min := 0.25; # (1) minimum operation point, relative to plant capacity
# timeseries
param N := 6; # number of time steps; must match with the table below
param : time : wind demand :=
1 0.2 2
2 0.2 1
3 0.4 5 # peak demand
4 0.2 1
5 0.3 3
6 0.1 5; # peak demand again
# END
end;