Skip to content

Merge pull request #139 from ATIX-AG/fix_sync_issue #7

Merge pull request #139 from ATIX-AG/fix_sync_issue

Merge pull request #139 from ATIX-AG/fix_sync_issue #7

Triggered via push October 2, 2024 07:27
Status Cancelled
Total duration 3m 34s
Artifacts 2

js_tests.yml

on: push
JavaScript  /  Setup matrix
3s
JavaScript / Setup matrix
Matrix: JavaScript / test
JavaScript  /  Test suite
3s
JavaScript / Test suite
Fit to window
Zoom out
Zoom in

Annotations

5 errors
JavaScript / Foreman develop Ruby 2.7 and Node 18
Canceling since a higher priority waiting request for 'master-JavaScript Testing' exists
JavaScript / Foreman develop Ruby 2.7 and Node 18
The operation was canceled.
JavaScript / Foreman develop Ruby 2.7 and Node 14
Canceling since a higher priority waiting request for 'master-JavaScript Testing' exists
JavaScript / Foreman develop Ruby 2.7 and Node 14
The operation was canceled.
JavaScript / Test suite
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
package-lock-ruby-27-node-14-foreman-develop.json Expired
396 KB
package-lock-ruby-27-node-18-foreman-develop.json Expired
425 KB