refactor: clarify upgrade builds #26557
integration.yml
on: pull_request
pre_check
/
Check preconditions and cancel previous jobs
6s
Annotations
5 errors
getting-started (local-npm)
Process completed with exit code 1.
|
test-docker-build (test)
Process completed with exit code 124.
|
test-docker-build (test)
Process completed with exit code 1.
|
test-docker-build (main)
The job was canceled because "test" failed.
|
test-docker-build (main)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
deployment-test-results-20230828T181605
Expired
|
424 MB |
|