Skip to content

Improve GCP uploading #708

Improve GCP uploading

Improve GCP uploading #708

Triggered via pull request November 14, 2023 11:19
Status Failure
Total duration 28m 39s
Artifacts 1

build.yaml

on: pull_request
Matrix: Build
Matrix: Test
Matrix: Testflows
Cleanup
3s
Cleanup
Fit to window
Zoom out
Zoom in

Annotations

24 errors
Testflows (23.8)
Process completed with exit code 1.
Testflows (22.8)
The job was canceled because "_23_8" failed.
Testflows (22.8)
The operation was canceled.
Testflows (22.3)
The job was canceled because "_23_8" failed.
Testflows (22.3)
The operation was canceled.
Testflows (23.3)
The job was canceled because "_23_8" failed.
Testflows (23.3)
The operation was canceled.
Test (1.21, 20.3)
Process completed with exit code 1.
Test (1.21, 19.17)
The job was canceled because "_1_21_20_3" failed.
Test (1.21, 19.17)
The operation was canceled.
Test (1.21, 23.3)
The job was canceled because "_1_21_20_3" failed.
Test (1.21, 23.3)
The operation was canceled.
Test (1.21, 21.3)
The job was canceled because "_1_21_20_3" failed.
Test (1.21, 21.3)
The operation was canceled.
Test (1.21, 20.8)
The job was canceled because "_1_21_20_3" failed.
Test (1.21, 20.8)
The operation was canceled.
Test (1.21, 22.3)
The job was canceled because "_1_21_20_3" failed.
Test (1.21, 22.3)
The operation was canceled.
Test (1.21, 22.8)
The job was canceled because "_1_21_20_3" failed.
Test (1.21, 22.8)
The operation was canceled.
Test (1.21, 21.8)
The job was canceled because "_1_21_20_3" failed.
Test (1.21, 21.8)
The operation was canceled.
Test (1.21, 23.8)
The job was canceled because "_1_21_20_3" failed.
Test (1.21, 23.8)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
build-test-artifacts Expired
144 MB