Skip to content

update

update #145

Triggered via push February 4, 2025 09:20
Status Failure
Total duration 11m 5s
Artifacts 1

push.yml

on: push
Publish dev build docker image to dockerhub
10m 54s
Publish dev build docker image to dockerhub
Matrix: Unit Test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
Unit Test (pkg/ethsighash)
Process completed with exit code 1.
Unit Test (pkg/timekeeper)
The job was canceled because "pkg_ethsighash" failed.
Unit Test (pkg/timekeeper)
The operation was canceled.
Unit Test (pkg/graphql)
The job was canceled because "pkg_ethsighash" failed.
Unit Test (pkg/graphql)
The operation was canceled.
Unit Test (pkg/erc4337/preset)
The job was canceled because "pkg_ethsighash" failed.
Unit Test (pkg/erc4337/preset)
The operation was canceled.
Unit Test (aggregator/)
The job was canceled because "pkg_ethsighash" failed.
Unit Test (aggregator/)
The operation was canceled.
Unit Test (core/taskengine)
The job was canceled because "pkg_ethsighash" failed.
Unit Test (core/taskengine)
The operation was canceled.
Unit Test (core/taskengine/macros)
The job was canceled because "pkg_ethsighash" failed.
Unit Test (core/taskengine/macros)
The operation was canceled.
Unit Test (core/taskengine/trigger)
The job was canceled because "pkg_ethsighash" failed.
Unit Test (core/taskengine/trigger)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
AvaProtocol~EigenLayer-AVS~PG1U08.dockerbuild
86.8 KB