Skip to content

Adjust proof tooling to support CBMC v6 #992

Adjust proof tooling to support CBMC v6

Adjust proof tooling to support CBMC v6 #992

Re-run triggered October 1, 2024 10:33
Status Failure
Total duration 5m 28s
Billable time 5m
Artifacts 2

ci.yml

on: pull_request
Fit to window
Zoom out
Zoom in

Annotations

4 errors
spell-check
Process completed with exit code 1.
proof_ci
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
proof_ci
The operation was canceled.
link-verifier
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
system_test_results
8.09 KB
unit_test_results
19.2 KB