Skip to content

Commit

Permalink
GITBOOK-121: Brand 30K Descope bc additional Visual Direction review …
Browse files Browse the repository at this point in the history
…cycyles
  • Loading branch information
widal001 authored and gitbook-bot committed May 2, 2024
1 parent 80313c9 commit 3799be9
Showing 1 changed file with 3 additions and 9 deletions.
Original file line number Diff line number Diff line change
Expand Up @@ -112,11 +112,11 @@ A set of activities that use the audit, brand behaviors, and key messaging frame

**Description**

Develop a final brand identity and all the associated assets, templates, and guidelines.
Develop a final brand identity and specified associated assets, templates, and guidelines.

**Goals**

* Deliver a final brand guidelines and all the associated assets and rules
* Deliver a final brand guidelines and specified associated assets and rules
* Gain alignment from all key stakeholders on the brand direction 

### Definition of done
Expand All @@ -142,12 +142,6 @@ Following sections describe the conditions that must be met to consider this del
* [ ] Final visual direction presentation and documentation
* [ ] Final visual identity system, including color, typography, logo, templates, assets, comms materials, illustrations and photography accessible and usable by intended stakeholders
* [ ] Final brand identity presentation and documentation
* [ ] Exact method of measurement for proposed metrics to be designed, determined, and implemented

### Proposed metrics

* Send a survey link to at least 10 HHS stakeholders to measure brand recognition, impact, how easy it is to use new tools and guidelines
* Method to measure the usability of the brand in the grants process itself, such as accessible colors and ranking of key message 

## Planning

Expand Down Expand Up @@ -224,7 +218,7 @@ If so, how are we addressing these risks?

Major updates to the content of this page will be added here.

<table data-full-width="true"><thead><tr><th width="137">Date</th><th width="282">Update</th><th>Notes</th></tr></thead><tbody><tr><td>4/5/2024</td><td>Added change log and implementation log</td><td>This is part of the April onsite follow-up</td></tr><tr><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td></tr></tbody></table>
<table data-full-width="true"><thead><tr><th width="137">Date</th><th width="282">Update</th><th>Notes</th></tr></thead><tbody><tr><td>4/5/2024</td><td>Added change log and implementation log</td><td>This is part of the April onsite follow-up</td></tr><tr><td>4/30/24</td><td>Agreed with HHS Project leadership to descope brand metrics &#x26; potentially narrowing the required Brand identity assets to be developed. </td><td>Scope reduction is with the goal of <em>hopefully</em> keeping scope within range to be completed by May 14th. If additional review cycles are necessary to achieve a visual direction that project leadership is confident in, delivery of final presentations and brand identity assets will extend past Sprint 23. </td></tr><tr><td></td><td></td><td></td></tr></tbody></table>

### Implementation log

Expand Down

1 comment on commit 3799be9

@github-actions
Copy link

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Coverage report for ./frontend

St.
Category Percentage Covered / Total
🟢 Statements 83.89% 854/1018
🟡 Branches 64.9% 220/339
🟡 Functions 75.34% 165/219
🟢 Lines 83.89% 797/950

Test suite run success

166 tests passing in 55 suites.

Report generated by 🧪jest coverage report action from 3799be9

Please sign in to comment.