If all of the best practices HRI01 through HRI09 are happily applied, chances are that the software project is in very good shape.
Aim to make all checks HRI01 through HRI09 pass.
The check HRI10 is successful if HRI01 through HRI09 are successful.
The success state of HRI10 is the overall exit code of the trust
utility, which is returned to the shell.