daily_ete_test_v100 #39
daily_ete_test_v100.yml
on: schedule
Matrix: linux-build
Matrix: test_evaluation
Matrix: test_restful
Matrix: test_tools
notify_to_feishu
8s
Annotations
6 errors and 2 warnings
test_tools (turbomind, mllm, restful)
The job running on runner v100-r1-new has exceeded the maximum execution time of 240 minutes.
|
test_tools (turbomind, mllm, restful)
The operation was canceled.
|
test_tools (pytorch, llm, restful)
The job running on runner v100-r1-new has exceeded the maximum execution time of 240 minutes.
|
test_tools (pytorch, llm, restful)
The operation was canceled.
|
get_coverage_report
Process completed with exit code 1.
|
notify_to_feishu
Process completed with exit code 43.
|
linux-build (py310)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
test_tools (turbomind, mllm, pipeline)
Docker pull failed with exit code 1, back off 1.04 seconds before retry.
|