Skip to content
Triggered via schedule February 29, 2024 08:11
Status Failure
Total duration 1m 29s
Artifacts

ci.yml

on: schedule
Matrix: check
Matrix: clippy
Matrix: execute
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (stable, ubuntu-22.04, -Zminimal-versions)
Process completed with exit code 101.
test (stable, windows-2022, -Zminimal-versions)
The job was canceled because "stable_ubuntu-22_04_-Zmin" failed.
test (stable, windows-2022, -Zminimal-versions)
The operation was canceled.
test (stable, windows-2022)
The job was canceled because "stable_ubuntu-22_04_-Zmin" failed.
test (stable, windows-2022)
The operation was canceled.
test (stable, macos-12)
The job was canceled because "stable_ubuntu-22_04_-Zmin" failed.
test (stable, macos-12)
The operation was canceled.
test (stable, macos-12, -Zminimal-versions)
The job was canceled because "stable_ubuntu-22_04_-Zmin" failed.
test (stable, macos-12, -Zminimal-versions)
The operation was canceled.