CI: don't fall over if cannot connect to upload server. #22
ci.yaml
on: push
Pre-build checks
11m 17s
Matrix: compile
Run fuzz regression tests
8m 47s
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
CI completion
0s
Annotations
5 errors
Test minimum supported BTC v25.0 with clang
Process completed with exit code 1.
|
Test CLN clang
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 120 minutes.
|
Test CLN clang
The operation was canceled.
|
Test CLN gcc
The job running on runner GitHub Actions 18 has exceeded the maximum execution time of 120 minutes.
|
Test CLN gcc
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
cln-compile-clang-sanitizers.tar.bz2
|
169 MB |
|
cln-compile-clang.tar.bz2
|
116 MB |
|
cln-compile-gcc-O3.tar.bz2
|
143 MB |
|
cln-compile-gcc.tar.bz2
|
115 MB |
|