Skip to content

Fix

Fix #174

Triggered via push January 30, 2025 18:36
Status Failure
Total duration 2m 16s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.8)
Process completed with exit code 4.
build (3.11)
The job was canceled because "_3_8" failed.
build (3.11)
Process completed with exit code 4.
build (3.10)
The job was canceled because "_3_8" failed.
build (3.10)
The operation was canceled.
build (3.9)
The job was canceled because "_3_8" failed.
build (3.9)
The operation was canceled.
build (3.12)
The job was canceled because "_3_8" failed.
build (3.12)
The operation was canceled.