Skip to content

Improve tests

Improve tests #114

Triggered via pull request August 8, 2023 20:31
Status Failure
Total duration 3m 13s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

test.yml

on: pull_request
Matrix: integration-test
Matrix: unit-test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
integration-test (3.6.15)
Process completed with exit code 1.
integration-test (3.9)
The job was canceled because "_3_6_15" failed.
integration-test (3.9)
Process completed with exit code 1.
integration-test (3.11)
The job was canceled because "_3_6_15" failed.
integration-test (3.11)
Process completed with exit code 1.
integration-test (3.8)
The job was canceled because "_3_6_15" failed.
integration-test (3.8)
Process completed with exit code 1.
integration-test (3.10)
The job was canceled because "_3_6_15" failed.
integration-test (3.10)
The operation was canceled.
integration-test (3.7)
The job was canceled because "_3_6_15" failed.
integration-test (3.7)
The operation was canceled.