Fix main execution adjusted to new uplc version #83
tests.yml
on: push
Matrix: test
Indicate completion to coveralls.io
0s
Annotations
7 errors
test (3.8)
Process completed with exit code 1.
|
test (3.11)
The job was canceled because "_3_8" failed.
|
test (3.11)
The operation was canceled.
|
test (3.10)
The job was canceled because "_3_8" failed.
|
test (3.10)
The operation was canceled.
|
test (3.9)
The job was canceled because "_3_8" failed.
|
test (3.9)
The operation was canceled.
|