Skip to content

Squashed commit of the following: #299

Squashed commit of the following:

Squashed commit of the following: #299

Triggered via push January 12, 2024 22:26
Status Failure
Total duration 1m 21s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

pio-test.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

11 errors
build (ESP8266-Wemos-D1-R2)
Process completed with exit code 1.
build (STM32F1-Bluepill-F103C8)
The job was canceled because "ESP8266-Wemos-D1-R2" failed.
build (STM32F1-Bluepill-F103C8)
The operation was canceled.
build (STM32F4-Blackpill-F401CC)
The job was canceled because "ESP8266-Wemos-D1-R2" failed.
build (STM32F4-Blackpill-F401CC)
The operation was canceled.
build (ESP32IDF-MKS-TINYBEE)
The job was canceled because "ESP8266-Wemos-D1-R2" failed.
build (ESP32IDF-MKS-TINYBEE)
The operation was canceled.
build (RP2040-PICO-W)
The job was canceled because "ESP8266-Wemos-D1-R2" failed.
build (RP2040-PICO-W)
The operation was canceled.
build (ESP32-MKS-TINYBEE)
The job was canceled because "ESP8266-Wemos-D1-R2" failed.
build (ESP32-MKS-TINYBEE)
The operation was canceled.