Skip to content

Commit

Permalink
bugfix: wrong unit for variable OPEX in Haber Bosch process
Browse files Browse the repository at this point in the history
  • Loading branch information
clarabachorz committed Oct 15, 2024
1 parent 91d5753 commit 16e7951
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion inst/extdata/database/tedfs/Tech/Haber-Bosch with ASU.csv
Original file line number Diff line number Diff line change
Expand Up @@ -7,7 +7,7 @@ OPEX Fixed Relative,,2022,#,3.0,,percent,,,,ArnaizdelPozo22,"Supplementary Infor
OPEX Fixed Relative,,2025,#,4.0,,percent,,,,Grahn22,"Table7"
OPEX Fixed Relative,,2040,#,4.0,,percent,,,,Grahn22,"Table7"
OPEX Fixed,Output Capacity|Ammonia,2018,#,17.0,,EUR_2018/a,1.0,kW;LHV,"Cost basis not given in the paper, assumed to be 2018.",Ikaheimo18,"Page 7, Table 3"
OPEX Variable,Output|Ammonia,2022,#,0.6,,EUR_2020,1.0,kWh;LHV,"As stated in Section 2.4.1, the ammonia output of the plant is measured in units of its lower heating value.",ArnaizdelPozo22,"Supplementary Information, Table 2"
OPEX Variable,Output|Ammonia,2022,#,0.6,,EUR_2020,1.0,MWh;LHV,"Includes Ammonia catalyst and make up water. Wrongly reported as EUR/kWh, is EUR/MWh according to the Authors' excel worksheets. As stated in Section 2.4.1, the ammonia output of the plant is measured in units of its lower heating value.",ArnaizdelPozo22,"Supplementary Information, Table 2"
Input|Hydrogen,Output|Ammonia,2015,#,0.178,,t,1.0,t,,Matzen15,Page 9 / Table 13
Input|Hydrogen,Output|Ammonia,2018,#,1.148,,kWh,1,kWh;LHV,Found in supplementary information,Stolz22,Table 5
Input|Electricity,Output|Ammonia,2015,Air-separation unit,3.1,,MJ,1.19,kg,"This source claims 3.1 MJ/kg electricity denand for the ASU. Assuming a nitrogen demand of 0.84 tonnes per tonne of ammonia, this amounts of an electricity demand of 3.1×0.85 GJ per tonne of ammonia.",Matzen15,Page 8 / Table 9
Expand Down

0 comments on commit 16e7951

Please sign in to comment.