Skip to content

Commit

Permalink
DOCS-2476
Browse files Browse the repository at this point in the history
  • Loading branch information
mig281 committed Dec 2, 2024
1 parent 4453411 commit f8955a0
Show file tree
Hide file tree
Showing 5 changed files with 16 additions and 10 deletions.
4 changes: 2 additions & 2 deletions _includes/content-reuse/create-configure-cluster.md
Original file line number Diff line number Diff line change
Expand Up @@ -12,7 +12,7 @@

1. On the **2. Confirm cluster protection level** page, Qumulo Core selects the recommended 2, 3, or 4-drive protection level based on your cluster size and node type.

{% if page.platform != 'q2uhg2' %}
{% unless page.platform contains 'q2uhg2' %}
1. If the **Customize Protection Level** option appears, you can increase your system resilience by selecting 3- or 4-drive protection.

{{site.data.alerts.important}}
Expand All @@ -25,7 +25,7 @@
<li>Using 3- or 4-drive protection reduces the total capacity of your cluster.</li>
</ul>
{{site.data.alerts.end}}
{% endif %}
{% endunless %}

1. Enter a password for the administrative account and click **Create Cluster**.

Expand Down
Original file line number Diff line number Diff line change
@@ -1,19 +1,25 @@
{% if page.platform != 'quiver' %}
{% unless page.platform contains 'quiver' %}
## To Perform the Part Replacement Procedure by Using the FVT
{{site.partReplaceDefine}}

{% if page.platform != 'hpe' %}
{% unless page.platform contains 'hpe' %}
{% capture content_tag %}{{site.partReplaceDcms}}{% endcapture %}
{% include note.html content=content_tag %}
{% endif %}
{% endif %}
{% endunless %}
{% endunless %}

1. Boot by using the latest version of the Qumulo Core USB Drive Installer.

1. Select **[*] Perform maintenance**.

1. Select **[2] Perform automatic repair after part replacement (non-destructive)**.

{% unless page.platform contains 'q2uhg2' %}
The part replacement procedure runs and the **FVT passed!** message appears.

{% include note.html content="In some cases, after the part replacement procedure, the message `FIX: Run the FVT flash command.` appears. Enter `1` as you would for a fixable issue to reboot the node and then repeat the part replacement procedure." %}
{% endunless %}

{% if page.platform contains 'q2uhg2' %}
Follow the prompts to complete the chassis replacement.
{% endif %}
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
{% capture checkNetworks %}{% if page.platform == 'all4110' %}Your {{site.all4110}} node uses a <a href="wiring-nodes-networking-cluster.html">split networking configuration</a>. Ensure that the <a href="wiring-nodes-networking-cluster.html#connecting-to-redundant-switches">front-end and back-end networks</a> are connected and operational before creating your cluster.{% elsif page.platform == 'q1uag1' %}The dual-NIC variant of your {{site.q1uag1}} node uses a <a href="configuring-ipmi-wiring-nodes.html">split networking configuration</a>. Ensure that the <a href="configuring-ipmi-wiring-nodes.html#step-2-connecting-the-100-gbps-ports">front-end and back-end networks</a> are connected and operational before creating your cluster.{% endif %}{% endcapture %}
{% capture checkNetworks %}{% if page.platform contains 'all4110' %}Your {{site.all4110}} node uses a <a href="wiring-nodes-networking-cluster.html">split networking configuration</a>. Ensure that the <a href="wiring-nodes-networking-cluster.html#connecting-to-redundant-switches">front-end and back-end networks</a> are connected and operational before creating your cluster.{% elsif page.platform contains 'q1uag1' %}The dual-NIC variant of your {{site.q1uag1}} node uses a <a href="configuring-ipmi-wiring-nodes.html">split networking configuration</a>. Ensure that the <a href="configuring-ipmi-wiring-nodes.html#step-2-connecting-the-100-gbps-ports">front-end and back-end networks</a> are connected and operational before creating your cluster.{% endif %}{% endcapture %}

{% capture unifiedNetworking %} If only one of the networks is connected and operational during the cluster creation process, Qumulo Core deploys with the unified networking configuration.{% endcapture %}

Expand Down
4 changes: 2 additions & 2 deletions hardware-guide/quiver-2u-hybrid-gen2/getting-started.md
Original file line number Diff line number Diff line change
Expand Up @@ -13,7 +13,7 @@ platform:


## Step 2: Boot by Using the Qumulo Core USB Drive Installer
1. When the node powers on and begins to boot, on the **ASUS** screen, press **F8**.
1. When the node powers on and begins to boot, enter the boot menu.

{{site.data.alerts.note}}
<ul>
Expand All @@ -22,7 +22,7 @@ platform:
</ul>
{{site.data.alerts.end}}

1. On the **Please select boot device:** screen, select your USB drive (usually labeled with `UEFI OS`) and boot into it.
1. On the boot device selection screen, select your USB drive (usually labeled with `UEFI OS`) and boot into it.

The Qumulo Core installation begins.

Expand Down
2 changes: 1 addition & 1 deletion hardware-guide/quiver-2u-hybrid-gen2/panel-leds.md
Original file line number Diff line number Diff line change
Expand Up @@ -5,7 +5,7 @@ permalink: /hardware-guide/quiver-2u-hybrid-gen2/panel-leds.html
sidebar: hardware_guide_sidebar
---

## Front and Rear Paanel LEDs and Buttons
## Front and Rear Panel LEDs and Buttons

For information about the front and rear panel LEDs and buttons, <a href="https://docs.qumulo.com/pdf/quiver-2uh-hybrid-rackmount-chassis-user-manual.pdf#page=11" class="pdf">Front Panel and Rear Panel (p. 11)</a> {{site.hardware.fromAIC}}.

Expand Down

0 comments on commit f8955a0

Please sign in to comment.