Skip to content

Merge pull request #2 from OpenInterpreter/main #3

Merge pull request #2 from OpenInterpreter/main

Merge pull request #2 from OpenInterpreter/main #3

Triggered via push December 24, 2024 18:58
Status Failure
Total duration 6h 0m 26s
Artifacts
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors
build (3.10)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 360 minutes.
build (3.10)
The operation was canceled.
build (3.12)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
build (3.12)
The operation was canceled.