-
Notifications
You must be signed in to change notification settings - Fork 8
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
- Loading branch information
1 parent
5350055
commit 9f7bb81
Showing
1 changed file
with
4 additions
and
0 deletions.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
|
@@ -14,7 +14,11 @@ The Product Blueprint is a comprehensive document required as the final delivera | |
- Completed [Milestone Manager & Token Release Request](https://docs.google.com/spreadsheets/d/1MF8G4e-szjFhGJP7KFo_K1aLyhwO2dWNHsE70Co1HqU/edit?gid=0#gid=0) to be used to keep track of all milestones listed in the Token Allocation Plan, completion status, supporting documentation for completed milestones, and to request a payout for successfully completed milestones by the Council and Foundation. Anytime a milestone is successfully completed this Milestone Manager & Token Release Request should be completed. The form should then be submitted to the Voi Council at [email protected]. | ||
- Completed [Product Design Grant Pitch Deck](https://docs.google.com/presentation/d/1R2Xm2yUCfyPe9hv-26zSEhA0oQ_TpBBakZGolnmWyzM/edit#slide=id.g2f5b142037c_0_45). Submitted via the google form application as a link. | ||
|
||
**Please also upload all supporting materials (bullets 2-4) in your proposal's relevant Discord chat for easy access** | ||
|
||
### Product Blueprint Deliverable Checklist | ||
All materials belw | ||
|
||
- Completed general grant [Final Report.](https://docs.google.com/forms/d/e/1FAIpQLSeNWpE0pJPM32w9VkjE5ZE7GxdKM0uGV76XNqaDFsHh2MJcUQ/viewform?usp=sf_link) We recommend preparing your responses in a separate document to avoid losing any hard work. | ||
- [Clickable Prototype](https://docs.google.com/document/d/18ftZqI99U5bsTeY3EZNqgsPkS0EKrHHDmx9oIWKDM0w/edit) (requirements also linked in the above Final Report). | ||
- Completed [Milestone Tracker](https://docs.google.com/document/d/17QS_FfhjEttHnXu2d3DWKk4qoD6irAv0F3sVF17Y6wQ/edit?usp=sharing) with completion dates and KPIs achieved. | ||
|