Skip to content

Test connectors: --concurrency=8 --support-level=certified #564

Test connectors: --concurrency=8 --support-level=certified

Test connectors: --concurrency=8 --support-level=certified #564

Manually triggered September 2, 2024 09:03
Status Failure
Total duration 6h 5m 57s
Billable time 6h 5m
Artifacts

connectors_nightly_build.yml

on: workflow_dispatch
Test connectors: --concurrency=8 --support-level=certified
6h 4m
Test connectors: --concurrency=8 --support-level=certified
Fit to window
Zoom out
Zoom in

Annotations

1 error and 1 warning
Test connectors: --concurrency=8 --support-level=certified
The job running on runner connector-nightly-xlarge_4aaeab55b398 has exceeded the maximum execution time of 360 minutes.
Test connectors: --concurrency=8 --support-level=certified
Runner connector-nightly-xlarge_4aaeab55b398 did not respond to a cancelation request with 00:05:00.