Test async sign_closing_transaction #261
build.yml
on: push
coverage
6m 5s
benchmark
37m 13s
check_commits
5m 46s
check_release
2m 25s
fuzz
9m 10s
linting
1m 10s
rustfmt
11s
incremental-mutants
6h 0m
Matrix: build
Annotations
5 errors and 1 warning
fuzz
Process completed with exit code 101.
|
build (windows-latest, 1.63.0)
The job running on runner GitHub Actions 22 has exceeded the maximum execution time of 360 minutes.
|
build (windows-latest, 1.63.0)
The operation was canceled.
|
incremental-mutants
The job running on runner GitHub Actions 27 has exceeded the maximum execution time of 360 minutes.
|
incremental-mutants
The operation was canceled.
|
fuzz
You are running out of disk space. The runner will stop working when the machine runs out of disk space. Free space left: 48 MB
|