Skip to content

chore(deps-dev): update ruff requirement from ~=0.8.6 to ~=0.9.0 #715

chore(deps-dev): update ruff requirement from ~=0.8.6 to ~=0.9.0

chore(deps-dev): update ruff requirement from ~=0.8.6 to ~=0.9.0 #715

Triggered via pull request January 10, 2025 11:24
Status Failure
Total duration 44s
Artifacts

unit-test.yml

on: pull_request
Matrix: test-ubuntu
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
test-ubuntu (3.11)
Process completed with exit code 1.
test-ubuntu (3.9)
The job was canceled because "_3_11" failed.
test-ubuntu (3.9)
The operation was canceled.
test-ubuntu (3.10)
The job was canceled because "_3_11" failed.
test-ubuntu (3.10)
The operation was canceled.
test-ubuntu (3.8)
The job was canceled because "_3_11" failed.
test-ubuntu (3.8)
The operation was canceled.
test-ubuntu (3.11)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636