fix(appset): Fix AppSet Webhook for gitlab merge requests (#13766) #22664
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
ci-build.yaml
on: pull_request
Build & cache Go code
6m 13s
Build, test & lint UI code
3m 23s
Ensure Go modules synchronicity
25s
Lint Go code
6m 56s
Check changes to generated code
11m 50s
Run unit tests with -race for Go packages
15m 51s
Matrix: Run end-to-end tests
Process & analyze test artifacts
29s
Annotations
7 errors
Run end-to-end tests (v1.25.4)
Process completed with exit code 2.
|
Run end-to-end tests (v1.24.3)
The job was canceled because "v1_25_4" failed.
|
Run end-to-end tests (v1.24.3)
The operation was canceled.
|
Run end-to-end tests (v1.26.0)
The job was canceled because "v1_25_4" failed.
|
Run end-to-end tests (v1.26.0)
The operation was canceled.
|
Run end-to-end tests (v1.27.2)
The job was canceled because "v1_25_4" failed.
|
Run end-to-end tests (v1.27.2)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
code-coverage
Expired
|
4.05 MB |
|
e2e-server-k8sv1.25.4.log
Expired
|
21.5 MB |
|
race-results
Expired
|
42.8 KB |
|
test-results
Expired
|
42.8 KB |
|