Skip to content

chore(deps): bump github.com/blinklabs-io/gouroboros from 0.76.0 to 0.77.0 #171

chore(deps): bump github.com/blinklabs-io/gouroboros from 0.76.0 to 0.77.0

chore(deps): bump github.com/blinklabs-io/gouroboros from 0.76.0 to 0.77.0 #171

Triggered via pull request April 1, 2024 14:42
Status Failure
Total duration 49s
Artifacts

go-test.yml

on: pull_request
Matrix: go-test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
go-test (1.21.x, ubuntu-latest)
Process completed with exit code 1.
go-test (1.21.x, macos-latest)
The job was canceled because "_1_21_x_ubuntu-latest" failed.
go-test (1.21.x, macos-latest)
Process completed with exit code 1.
go-test (1.20.x, ubuntu-latest)
The job was canceled because "_1_21_x_ubuntu-latest" failed.
go-test (1.20.x, ubuntu-latest)
The operation was canceled.
go-test (1.20.x, macos-latest)
The job was canceled because "_1_21_x_ubuntu-latest" failed.
go-test (1.20.x, macos-latest)
The operation was canceled.