Skip to content

prepare for 0.5

prepare for 0.5 #89

Triggered via push December 7, 2023 01:52
Status Cancelled
Total duration 3h 15m 28s
Artifacts

main.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (ubuntu-latest, 4.14.x)
The run was canceled by @c-cube.
build (ubuntu-latest, 4.14.x)
The operation was canceled.
build (ubuntu-latest, 5.0.x)
The run was canceled by @c-cube.
build (ubuntu-latest, 5.0.x)
The operation was canceled.
build (ubuntu-latest, 4.08.x)
The run was canceled by @c-cube.
build (ubuntu-latest, 4.08.x)
The operation was canceled.