[DPE-4867] - Release new rock and fix broken CI #180
integration.yaml
on: pull_request
Build rock
/
Collect platforms for rock | .
15s
Matrix: Build rock / build
Matrix: integration
Annotations
5 errors
integration (ha-integration)
Process completed with exit code 4.
|
integration (integration)
Canceling since a higher priority waiting request for 'Operator Tests-refs/pull/35/merge' exists
|
integration (integration)
The operation was canceled.
|
integration (tls-integration)
Canceling since a higher priority waiting request for 'Operator Tests-refs/pull/35/merge' exists
|
integration (tls-integration)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
packed-rock-architecture-amd64
Expired
|
283 MB |
|