Skip to content

ci: do not merge in packaging test #99

ci: do not merge in packaging test

ci: do not merge in packaging test #99

Triggered via pull request January 14, 2025 04:04
Status Failure
Total duration 35s
Artifacts

packaging-tests.yml

on: pull_request
Check patches (packaging PR)
0s
Check patches (packaging PR)
Matrix: Check patches (upstream PR)
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Check patches (upstream PR) (ubuntu/oracular)
Process completed with exit code 1.
Check patches (upstream PR) (ubuntu/focal)
The job was canceled because "ubuntu_oracular" failed.
Check patches (upstream PR) (ubuntu/focal)
Process completed with exit code 1.
Check patches (upstream PR) (ubuntu/jammy)
The job was canceled because "ubuntu_oracular" failed.
Check patches (upstream PR) (ubuntu/jammy)
Process completed with exit code 1.
Check patches (upstream PR) (ubuntu/noble)
The job was canceled because "ubuntu_oracular" failed.
Check patches (upstream PR) (ubuntu/noble)
The operation was canceled.
Check patches (upstream PR) (ubuntu/devel)
The job was canceled because "ubuntu_oracular" failed.
Check patches (upstream PR) (ubuntu/devel)
The operation was canceled.