Skip to content

vSphere infrastructure provider template #118

vSphere infrastructure provider template

vSphere infrastructure provider template #118

Triggered via pull request August 5, 2024 13:37
Status Failure
Total duration 1h 19m 48s
Artifacts 1

e2e.yaml

on: pull_request
Build & Run E2E Images
18m 9s
Build & Run E2E Images
Matrix: Run E2E Tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Run E2E Tests (Workload cluster creation)
Process completed with exit code 2.
Run E2E Tests (KCP remediation)
The job was canceled because "Workload_cluster_creation" failed.
Run E2E Tests (KCP remediation)
The operation was canceled.
Run E2E Tests (MachineDeployment remediation)
The job was canceled because "Workload_cluster_creation" failed.
Run E2E Tests (MachineDeployment remediation)
The operation was canceled.
Run E2E Tests (Workload cluster scaling)
The job was canceled because "Workload_cluster_creation" failed.
Run E2E Tests (Workload cluster scaling)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
e2e-images Expired
1.27 GB