chore(deps): update dependency openstacksdk to v4 #1815
e2e_test.yaml
on: pull_request
end-to-end test using private-endpoint
/
Plan
5s
Matrix: end-to-end test using private-endpoint / build
Matrix: end-to-end test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
end-to-end test using private-endpoint
/
Plan Image Scanning
0s
end-to-end test using private-endpoint
/
Required Integration Test Status Checks
0s
Matrix: end-to-end test using private-endpoint / scan
Required E2E Test Status Checks
0s
Annotations
3 errors
end-to-end test using private-endpoint / Build charm (github-runner)
The process '/snap/bin/charmcraft' failed with exit code 1
|
end-to-end test using private-endpoint / Required Integration Test Status Checks
Process completed with exit code 1.
|
Required E2E Test Status Checks
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
2024-09-13T18-47-28-b075__plan
|
299 Bytes |
|